IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

70

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0482 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,040 $1,459 Implemented
AS0482 # 03 Y:2020 03 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,701 $160 Implemented
AS0482 # 01 Y:2020 01 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,090 $200 Implemented
AS0382 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $736 $128,880 Implemented
AS0382 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $44,391 $50 Implemented
AS0382 # 02 Y:2004 02 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,403 $240 Implemented
AS0382 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $743 $6,446 Implemented
AS0382 # 05 Y:2004 05 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,254 $4,200 Implemented
AS0382 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $516 $1,697 Implemented
AS0382 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $17,174 $840 Implemented
AS0382 # 08 Y:2004 08 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $6,306 $300 Implemented
AS0382 # 09 Y:2004 09 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $128,880 $850 Implemented
AS0382 # 10 Y:2004 10 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $1,540 $3,735 Implemented
AS0382 # 11 Y:2004 11 2004 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $4,650 $36,448 Implemented
AS0382 # 12 Y:2004 12 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,219 $1,125 Implemented
AS0381 # 05 Y:2004 05 2004 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $396 $30 Implemented
AS0381 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,696 $45 Implemented
AS0381 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,379 $74,008 Implemented
AS0381 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $738 $30 Implemented
AS0380 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,340 $7,360 Implemented
AS0380 # 01 Y:2004 01 2004 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $84,336 $312,400 Implemented
AS0380 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,343 $30 Implemented
AS0380 # 03 Y:2004 03 2004 REPROCESS SPENT OILS ON SITE FOR RE-USE $6,189 $11,970 Implemented
AS0380 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,843 $1,418 Implemented
AS0380 # 08 Y:2004 08 2004 REPAIR AND ELIMINATE STEAM LEAKS $1,211 $150 Implemented