IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,762

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0266 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $382 $323 Implemented
BD0266 # 08 Y:2004 08 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $329 $510 Implemented
BD0266 # 10 Y:2004 10 2004 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $1,020 $96 Implemented
BD0266 # 11 Y:2004 11 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,200 $96 Implemented
BD0266 # 12 Y:2004 12 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,404 $2,500 Implemented
BD0263 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,939 $2,400 Implemented
BD0263 # 09 Y:2004 09 2004 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $691 $1,050 Implemented
BD0263 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $421 $377 Implemented
BD0263 # 11 Y:2004 11 2004 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $26,600 $130 Implemented
BD0262 # 01 Y:2004 01 2004 INSTALL TURBULATORS $40,923 $2,400 Implemented
BD0262 # 02 Y:2004 02 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $12,994 $3,000 Implemented
BD0262 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,116 $8,920 Implemented
BD0262 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $3,267 $1,200 Implemented
BD0262 # 07 Y:2004 07 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,261 $850 Implemented
BD0262 # 08 Y:2004 08 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $287 $286 Implemented
BD0262 # 13 Y:2004 13 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $13,000 $300 Implemented
BD0262 # 14 Y:2004 14 2004 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,289 $5,500 Implemented
BD0264 # 02 Y:2004 02 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,965 $200 Implemented
BD0264 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,433 $60 Implemented
BD0264 # 04 Y:2004 04 2004 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $2,232 $3,600 Implemented
BD0264 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $547 $182 Implemented
BD0264 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $353 $345 Implemented
BD0264 # 10 Y:2004 10 2004 INSTALL OCCUPANCY SENSORS $282 $600 Implemented
BD0264 # 11 Y:2004 11 2004 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $3,760 $2,200 Implemented
BD0264 # 12 Y:2004 12 2004 AUTOMATE PAYROLL SYSTEM $2,500 $3,000 Implemented