IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,685

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0120 # 08 Y:1998 08 1998 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $2,430 $1,000 Not Implemented
BD0120 # 09 Y:1998 09 1998 PAY BILLS ON TIME TO AVOID LATE FEES $332 $0 Not Implemented
BD0119 # 01 Y:1998 01 1998 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $23,453 $10,000 n/a
BD0119 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,670 $4,000 n/a
BD0119 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,663 $3,460 n/a
BD0119 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,434 $400 n/a
BD0119 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,178 $3,835 n/a
BD0119 # 06 Y:1998 06 1998 INSTALL OCCUPANCY SENSORS $1,158 $600 n/a
BD0119 # 07 Y:1998 07 1998 USE OPTIMUM THICKNESS INSULATION $1,125 $1,515 n/a
BD0119 # 08 Y:1998 08 1998 USE OPTIMUM THICKNESS INSULATION $549 $2,127 n/a
BD0119 # 09 Y:1998 09 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $382 $430 n/a
BD0119 # 10 Y:1998 10 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $230 $205 n/a
BD0119 # 11 Y:1998 11 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $132,757 $160,000 n/a
BD0119 # 12 Y:1998 12 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $13,430 $14,000 n/a
BD0119 # 13 Y:1998 13 1998 RECOVER AND REUSE WASTE MATERIAL $2,982 $7,000 n/a
BD0119 # 14 Y:1998 14 1998 MOVE PRODUCT USING MECHANICAL MEANS $4,359 $14,000 n/a
BD0119 # 15 Y:1998 15 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,737 $1,365 n/a
BD0117 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,633 $4,940 Implemented
BD0117 # 02 Y:1998 02 1998 INSTALL OCCUPANCY SENSORS $2,244 $850 Not Implemented
BD0117 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,736 $650 Implemented
BD0117 # 04 Y:1998 04 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $930 $278 Not Implemented
BD0117 # 05 Y:1998 05 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $474 $0 Not Implemented
BD0117 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $701 $335 Not Implemented
BD0117 # 07 Y:1998 07 1998 INSTALL TURBULATORS $277 $500 Implemented
BD0117 # 08 Y:1998 08 1998 USE SYNTHETIC LUBRICANT $238 $400 Not Implemented