IAC Assessment: BD0117
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0117
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1998
Principal Product printed material
NAICS n/a
SIC 2700 -
Sales $10,000,000-$50,000,000
# of Employees 87
Plant Area (Sq.Ft.) 29,106
Annual Production 50,000,000 Pieces
Production Hrs. Annual 7,488
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $69,382 1,087,046 kWh $0.06
Electricity Demand $9,528 4,047 kW-months/year $2.35
Electricity Fees $816 - $ -
Natural Gas $10,303 2,219 MMBtu $4.64
TOTAL ENERGY COSTS $93,735
RECOMMENDED SAVINGS* $30,465 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,714
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,633
Cost:
$4,940
$4,023 62,720 $610 75 - - - - - - $4,023
62,720
kWh
$610
75
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,244
Cost:
$850
$1,596 24,912 $648 80 - - - - - - $1,596
24,912
kWh
$648
80
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,736
Cost:
$650
$1,510 23,447 $226 28 - - - - - - $1,510
23,447
kWh
$226
28
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$930
Cost:
$278
$808 12,603 $122 15 - - - - - - $808
12,603
kWh
$122
15
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$474
Cost:
-
$412 6,448 $62 8 - - - - - - $412
6,448
kWh
$62
8
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$701
Cost:
$335
$235 3,810 $40 5 - - - - $426 - $235
3,810
kWh
$40
5
kW-months/year
-
-
MMBtu
-
-
Tgal
$426
-
$
07: 2.1222 INSTALL TURBULATORS Savings:
$277
Cost:
$500
- - - - $277 62 - - - - -
-
kWh
-
-
kW-months/year
$277
62
MMBtu
-
-
Tgal
-
-
$
08: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$238
Cost:
$400
$206 3,224 $32 4 - - - - - - $206
3,224
kWh
$32
4
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$164
Cost:
$250
$142 2,345 $22 3 - - - - - - $142
2,345
kWh
$22
3
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
10: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$2,584
Cost:
$1,500
- - - - - - $2,584 943,488 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,584
943,488
Tgal
-
-
$
11: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$16,484
Cost:
$10,000
- - - - - - - - $16,484 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$16,484
-
$
TOTAL RECOMMENDED Savings:
$30,465
Cost:
$19,703
$8,932 139,509 $1,762 218 $277 62 $2,584 943,488 $16,910 - $8,932
139,509
kWh
$1,762
218
kW-months/year
$277
62
MMBtu
$2,584
943,488
Tgal
$16,910
-
$
TOTAL IMPLEMENTED Savings:
$25,714
Cost:
$17,590
$5,533 86,167 $836 103 $277 62 $2,584 943,488 $16,484 - $5,533
86,167
kWh
$836
103
kW-months/year
$277
62
MMBtu
$2,584
943,488
Tgal
$16,484
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes