IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,685

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0293 # 07 Y:2005 07 2005 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $4,251 $1,250 Implemented
BD0293 # 08 Y:2005 08 2005 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,306 $3,500 Not Implemented
BD0295 # 01 Y:2005 01 2005 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $32,765 $600 Implemented
BD0295 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,254 $8,470 Implemented
BD0295 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,391 $900 Implemented
BD0295 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $14,253 $2,875 Implemented
BD0295 # 05 Y:2005 05 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,487 $3,000 Implemented
BD0295 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,724 $0 Implemented
BD0295 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $423 $0 Implemented
BD0294 # 01 Y:2005 01 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,821 $400 Implemented
BD0294 # 02 Y:2005 02 2005 INSTALL OCCUPANCY SENSORS $1,291 $750 Not Implemented
BD0294 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $599 $263 Implemented
BD0294 # 04 Y:2005 04 2005 INSTALL AUTOMATIC PACKING EQUIPMENT $41,600 $22,000 Implemented
BD0294 # 05 Y:2005 05 2005 EXPAND OPERATIONS INTO UNUSED SPACE $40,952 $20,000 Implemented
BD0294 # 06 Y:2005 06 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $13,260 $2,000 Implemented
BD0294 # 07 Y:2005 07 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $8,840 $3,000 Implemented
BD0292 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,591 $36,320 Implemented
BD0292 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,594 $7,360 Implemented
BD0292 # 03 Y:2005 03 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,205 $25,000 Implemented
BD0292 # 04 Y:2005 04 2005 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE $11,542 $5,600 Not Implemented
BD0292 # 05 Y:2005 05 2005 HEAT WATER WITH EXHAUST HEAT $9,106 $17,512 Not Implemented
BD0292 # 06 Y:2005 06 2005 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $1,915 $2,680 Implemented
BD0292 # 07 Y:2005 07 2005 BURN A LESS EXPENSIVE GRADE OF FUEL $1,500 $1,400 Implemented
BD0292 # 08 Y:2005 08 2005 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE $647 $0 Not Implemented
BD0291 # 01 Y:2005 01 2005 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $126,274 $320,000 Not Implemented