IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

997

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0031 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $242 $660 Implemented
BS0030 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,042 $1,697 Implemented
BS0030 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,268 $11,600 Not Implemented
BS0030 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,073 $23,840 Not Implemented
BS0030 # 04 Y:2014 04 2014 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $2,459 $2,500 Not Implemented
BS0029 # 01 Y:2014 01 2014 INCREASE EFFICIENCY OF TRUCKS $19,366 $24,000 Not Implemented
BS0029 # 02 Y:2014 02 2014 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $57,736 $307,920 Not Implemented
BS0029 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,130 $3,375 Not Implemented
BS0029 # 04 Y:2014 04 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $275 $29 Not Implemented
BS0029 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,677 $726 Not Implemented
BS0029 # 06 Y:2014 06 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,602 $33,371 Not Implemented
BS0028 # 01 Y:2014 01 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,764 $1,960 Implemented
BS0028 # 02 Y:2014 02 2014 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $10,219 $7,950 Implemented
BS0028 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,895 $15,396 Implemented
BS0028 # 04 Y:2014 04 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,837 $449 Implemented
BS0028 # 05 Y:2014 05 2014 REPAIR OR REPLACE STEAM TRAPS $60,962 $13,425 Implemented
BS0028 # 06 Y:2014 06 2014 DIRECT WARMEST AIR TO COMBUSTION INTAKE $6,297 $380 Not Implemented
BS0028 # 07 Y:2014 07 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,854 $4,175 Not Implemented
BS0028 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,203 $15,635 Implemented
BS0027 # 01 Y:2014 01 2014 BURN A LESS EXPENSIVE GRADE OF FUEL $40,833 $51,377 Not Implemented
BS0027 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,592 $3,814 Implemented
BS0027 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $487 $168 Implemented
BS0027 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $253 $12,282 Implemented
BS0027 # 05 Y:2014 05 2014 REPAIR OR REPLACE STEAM TRAPS $37,433 $17,740 Implemented
BS0027 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,276 $320 Implemented