IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

997

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0014 # 05 Y:2013 05 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,647 $48,320 Not Implemented
BS0014 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $94 $230 Not Implemented
BS0014 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $79 $324 Not Implemented
BS0014 # 08 Y:2013 08 2013 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $621 $299 Not Implemented
BS0014 # 09 Y:2013 09 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $190 $180 Not Implemented
BS0016 # 01 Y:2013 01 2013 UPGRADE CONTROLS ON COMPRESSORS $15,856 $27,630 Implemented
BS0016 # 02 Y:2013 02 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $571 $184 Implemented
BS0016 # 03 Y:2013 03 2013 INSULATE BARE EQUIPMENT $437 $604 Implemented
BS0016 # 04 Y:2013 04 2013 COVER OPEN TANKS $4,197 $1,600 Implemented
BS0016 # 05 Y:2013 05 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,127 $6,826 Not Implemented
BS0016 # 06 Y:2013 06 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,648 $1,185 Not Implemented
BS0009 # 01 Y:2013 01 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,591 $260 Implemented
BS0009 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $1,495 $1,840 Not Implemented
BS0009 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,533 $2,806 Not Implemented
BS0009 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,077 $689 Implemented
BS0009 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,037 $126 Implemented
BS0009 # 06 Y:2013 06 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $5,422 $3,959 Implemented
BS0009 # 07 Y:2013 07 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $3,187 $1,066 Not Implemented
BS0009 # 08 Y:2013 08 2013 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $11,756 $210 Not Implemented
BS0009 # 09 Y:2013 09 2013 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $743,387 $1,700,000 Not Implemented
BS0013 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,038 $5,639 Implemented
BS0013 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,210 $20 Implemented
BS0013 # 03 Y:2013 03 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $199 $250 Not Implemented
BS0013 # 04 Y:2013 04 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,825 $22,200 Not Implemented
BS0013 # 05 Y:2013 05 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $312 $77 Implemented