Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

115

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0108 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $6,587 $25,166 Not Implemented
BS0108 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $443 $1,238 Not Implemented
BS0108 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,696 $1,050 Not Implemented
BS0108 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $104 $165 Not Implemented
BS0108 # 06 Y:2017 06 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $240 $270 Not Implemented
BS0108 # 02 Y:2017 02 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,658 $290 Not Implemented
BS0107 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $54,676 $1,500 Not Implemented
BS0107 # 03 Y:2017 03 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $23,395 $2,640 Not Implemented
BS0107 # 01 Y:2017 01 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $4,338 $5,117 Not Implemented
BS0107 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,021 $32,160 Not Implemented
BS0107 # 02 Y:2017 02 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,846 $2,224 Not Implemented
BS0106 # 01 Y:2017 01 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $374 $275 Implemented
BS0106 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $185 $48 Implemented
BS0106 # 03 Y:2017 03 2017 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,159 $710 Implemented
BS0105 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $78 $165 Implemented
BS0105 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $892 $1,020 Implemented
BS0105 # 01 Y:2017 01 2017 RECOVER AND REUSE WASTE MATERIAL $7,451 $31,180 Not Implemented
BS0104 # 06 Y:2017 06 2017 ELIMINATE/REDUCE AN OPERATION $72 $169 Not Implemented
BS0104 # 05 Y:2017 05 2017 UPGRADE CONTROLS ON COMPRESSORS $5,010 $7,576 Not Implemented
BS0104 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $36,306 $482 Not Implemented
BS0104 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $444 $990 Not Implemented
BS0104 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $55,510 $60,400 Not Implemented
BS0104 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $120,755 $55,860 Not Implemented
BS0104 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $338 $198 Not Implemented
BS0104 # 08 Y:2017 08 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,363 $968 Not Implemented