Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

185

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0126 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,569 $1,440 Not Implemented
BS0126 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $130 $20 Not Implemented
BS0126 # 01 Y:2019 01 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $308 $53 Not Implemented
BS0124 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,609 $1,030 Not Implemented
BS0124 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,460 $2,200 Not Implemented
BS0124 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,766 $6,213 Not Implemented
BS0124 # 02 Y:2019 02 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $392 $1,259 Not Implemented
BS0118 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $545 $210 Not Implemented
BS0118 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $616 $960 Not Implemented
BS0118 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $257 $30 Not Implemented
BS0118 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $1,313 $760 Not Implemented
BS0118 # 07 Y:2019 07 2019 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $10,186 $790 Not Implemented
BS0118 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $821 $275 Not Implemented
BS0118 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,275 $20 Not Implemented
BS0117 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $413 $1,047 Not Implemented
BS0117 # 01 Y:2019 01 2019 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $32,085 $5,600 Not Implemented
BS0117 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,373 $350 Not Implemented
BS0117 # 05 Y:2019 05 2019 ISOLATE HOT OR COLD EQUIPMENT $3,322 $502 Not Implemented
BS0117 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,573 $1,650 Not Implemented
BS0107 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,021 $32,160 Not Implemented
BS0107 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $54,676 $1,500 Not Implemented
BS0107 # 01 Y:2017 01 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $4,338 $5,117 Not Implemented
BS0107 # 03 Y:2017 03 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $23,395 $2,640 Not Implemented
BS0107 # 02 Y:2017 02 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,846 $2,224 Not Implemented
BS0098 # 03 Y:2017 03 2017 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $601 $1,100 Implemented