Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
210
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CI0008 # 03 Y:2023 | 03 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $27,340 | $27,100 | n/a |
CI0008 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $27,002 | $37,785 | n/a |
CI0008 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $20,780 | $10,000 | n/a |
CI0008 # 06 Y:2023 | 06 | 2023 | SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS | $18,232 | $8,000 | n/a |
CI0008 # 07 Y:2023 | 07 | 2023 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $8,144 | $15,610 | n/a |
CI0007 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $52,065 | $0 | n/a |
CI0007 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,880 | $300 | n/a |
CI0007 # 03 Y:2023 | 03 | 2023 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $4,072 | $15,610 | n/a |
CI0007 # 04 Y:2023 | 04 | 2023 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $3,248 | $4,500 | n/a |
CI0007 # 05 Y:2023 | 05 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,887 | $50 | n/a |
CI0007 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,123 | $836 | n/a |
CI0007 # 07 Y:2023 | 07 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $853 | $0 | n/a |
CI0007 # 08 Y:2023 | 08 | 2023 | SCHEDULE USE OF ELEVATORS TO CONSERVE ENERGY | $663 | $0 | n/a |
CI0006 # 01 Y:2022 | 01 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $28,328 | $32,800 | n/a |
CI0006 # 02 Y:2022 | 02 | 2022 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $26,391 | $90,000 | n/a |
CI0006 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,728 | $6,000 | n/a |
CI0006 # 04 Y:2022 | 04 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $14,859 | $82,655 | n/a |
CI0006 # 05 Y:2022 | 05 | 2022 | REPLACE BOILER | $13,563 | $27,000 | n/a |
CI0006 # 06 Y:2022 | 06 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,279 | $500 | n/a |
CI0006 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,588 | $1,342 | n/a |
CI0005 # 01 Y:2022 | 01 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $38,200 | $16,400 | n/a |
CI0005 # 02 Y:2022 | 02 | 2022 | REPLACE BOILER | $15,803 | $9,000 | n/a |
CI0005 # 03 Y:2022 | 03 | 2022 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $9,639 | $30,000 | n/a |
CI0005 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,840 | $300 | n/a |
CI0005 # 05 Y:2022 | 05 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $3,625 | $13,372 | n/a |