IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

253

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL1807 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $38,713 $42,563 Not Implemented
CL1807 # 03 Y:2018 03 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,718 $15,500 Not Implemented
CL1807 # 04 Y:2018 04 2018 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $3,717 $3,050 Not Implemented
CL1807 # 05 Y:2018 05 2018 REPLACE BOILER $1,478 $750 Not Implemented
CL1806 # 01 Y:2018 01 2018 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $66,598 $22,500 Not Implemented
CL1806 # 02 Y:2018 02 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $45,354 $46,500 Not Implemented
CL1806 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,631 $52,880 Implemented
CL1806 # 04 Y:2018 04 2018 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $23,451 $12,200 Not Implemented
CL1806 # 05 Y:2018 05 2018 REPLACE TREATED WATER WITH WELL / SURFACE WATER $7,271 $4,700 Not Implemented
CL1806 # 06 Y:2018 06 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,909 $0 Implemented
CL1805 # 01 Y:2018 01 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $50,691 $506,862 Implemented
CL1805 # 02 Y:2018 02 2018 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,183 $13,011 Implemented
CL1805 # 03 Y:2018 03 2018 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $637 $2,500 Not Implemented
CL1804 # 01 Y:2018 01 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $156,853 $28,500 Implemented
CL1804 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,306 $184,601 Implemented
CL1804 # 03 Y:2018 03 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $42,335 $15,500 Not Implemented
CL1804 # 04 Y:2018 04 2018 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $39,409 $3,050 Implemented
CL1804 # 05 Y:2018 05 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $34,121 $34,121 Not Implemented
CL1803 # 01 Y:2018 01 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $40,277 $14,300 Implemented
CL1803 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,516 $9,852 Implemented
CL1803 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,656 $2,080 Implemented
CL1803 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $386 $0 Implemented
CL1802 # 01 Y:2018 01 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,952 $0 Not Implemented
CL1802 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,648 $20,897 Not Implemented
CL1802 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,049 $0 Not Implemented