Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,715
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0023 # 03 Y:1985 | 03 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,891 | $5,000 | Implemented |
CO0023 # 04 Y:1985 | 04 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,690 | $375 | Implemented |
CO0023 # 05 Y:1985 | 05 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $159 | $20 | Not Implemented |
CO0023 # 06 Y:1985 | 06 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $1,957 | $10,000 | Not Implemented |
CO0023 # 07 Y:1985 | 07 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,364 | $100 | Implemented |
CO0018 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,938 | $798 | Implemented |
CO0018 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $511 | $300 | Implemented |
CO0018 # 03 Y:1985 | 03 | 1985 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $17,952 | $100 | Implemented |
CO0018 # 04 Y:1985 | 04 | 1985 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $54 | $92 | Implemented |
CO0018 # 05 Y:1985 | 05 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $304 | $51 | Implemented |
CO0018 # 06 Y:1985 | 06 | 1985 | USE OPTIMUM THICKNESS INSULATION | $550 | $210 | Implemented |
CO0018 # 07 Y:1985 | 07 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $8,891 | $2,400 | Implemented |
CO0018 # 08 Y:1985 | 08 | 1985 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $246 | $50 | Implemented |
CO0018 # 09 Y:1985 | 09 | 1985 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $863 | $500 | Not Implemented |
CO0019 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $568 | $353 | Implemented |
CO0019 # 02 Y:1985 | 02 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,533 | $3,200 | Implemented |
CO0019 # 03 Y:1985 | 03 | 1985 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $1,278 | $2,000 | Not Implemented |
CO0019 # 04 Y:1985 | 04 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $4,121 | $218 | Not Implemented |
CO0019 # 05 Y:1985 | 05 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,572 | $4,000 | Not Implemented |
CO0019 # 06 Y:1985 | 06 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $657 | $1,200 | Not Implemented |
CO0019 # 07 Y:1985 | 07 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $568 | $30 | Not Implemented |
CO0020 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,993 | $2,632 | Implemented |
CO0020 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,084 | $350 | Implemented |
CO0020 # 03 Y:1985 | 03 | 1985 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $689 | $450 | Implemented |
CO0020 # 04 Y:1985 | 04 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,378 | $1,800 | Implemented |