IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0502 # 02 Y:2002 02 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,090 $6,200 Not Implemented
CO0502 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,060 $1,050 Implemented
CO0502 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $830 $0 Not Implemented
CO0502 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $360 $30 Implemented
CO0501 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,890 $12,000 Not Implemented
CO0501 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $11,610 $1,980 Not Implemented
CO0501 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $9,180 $10,000 Not Implemented
CO0501 # 04 Y:2002 04 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $5,020 $2,000 Not Implemented
CO0501 # 05 Y:2002 05 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $3,440 $2,000 Not Implemented
CO0501 # 06 Y:2002 06 2002 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $2,900 $0 Not Implemented
CO0501 # 07 Y:2002 07 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $620 $500 Not Implemented
CO0501 # 08 Y:2002 08 2002 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $137,140 $300,000 Not Implemented
CO0501 # 09 Y:2002 09 2002 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $3,230 $6,500 Not Implemented
CO0500 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $29,000 $7,000 Implemented
CO0500 # 02 Y:2002 02 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,990 $300 Implemented
CO0500 # 03 Y:2002 03 2002 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $2,640 $5,750 Not Implemented
CO0500 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $1,110 $4,890 Not Implemented
CO0500 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $730 $300 Implemented
CO0500 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $290 $50 Implemented
CO0500 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $80 $0 Not Implemented
CO0497 # 01 Y:2001 01 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,250 $12,000 n/a
CO0497 # 02 Y:2001 02 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,610 $22,110 Implemented
CO0497 # 03 Y:2001 03 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,470 $7,170 Implemented
CO0497 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,230 $440 Implemented
CO0497 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $770 $430 Implemented