IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,456

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0550 # 08 Y:2004 08 2004 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,570 $1,000 Implemented
CO0550 # 09 Y:2004 09 2004 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,210 $17,000 Not Implemented
CO0550 # 10 Y:2004 10 2004 ADD AREA LIGHTING SWITCHES $2,070 $4,850 Implemented
CO0550 # 11 Y:2004 11 2004 PAY BILLS ON TIME TO AVOID LATE FEES $390 $0 Implemented
CO0549 # 01 Y:2004 01 2004 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $29,210 $116,000 Not Implemented
CO0549 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,000 $27,900 Not Implemented
CO0549 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $6,130 $3,800 Not Implemented
CO0549 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,920 $510 Implemented
CO0549 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,780 $60 Not Implemented
CO0549 # 06 Y:2004 06 2004 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $650 $500 Implemented
CO0549 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $390 $360 Not Implemented
CO0549 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,840 $58,140 Implemented
CO0548 # 01 Y:2004 01 2004 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $16,080 $1,150 Implemented
CO0548 # 02 Y:2004 02 2004 DISTILL CONTAMINATED SOLVENTS FOR REUSE $14,440 $12,420 Implemented
CO0548 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,940 $360 Implemented
CO0548 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,330 $60 Implemented
CO0548 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $130 $340 Not Implemented
CO0548 # 06 Y:2004 06 2004 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $960 $500 Implemented
CO0548 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $136 $70 Implemented
CO0546 # 01 Y:2004 01 2004 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $53,860 $348,900 Not Implemented
CO0546 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $974 $2,964 Implemented
CO0546 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,310 $7,930 Not Implemented
CO0546 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,450 $110 Implemented
CO0546 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $780 $4,870 Not Implemented
CO0547 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,630 $1,790 Not Implemented