Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,456
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0488 # 06 Y:2001 | 06 | 2001 | REPLACE HEAVY METAL REAGENTS WITH NON-HAZARDOUS REAGENTS | $21,060 | $14,000 | Not Implemented |
CO0488 # 07 Y:2001 | 07 | 2001 | USE CYLINDRICAL TANKS WITH HEIGHT TO DIAMETER RATIOS CLOSE TO ONE TO REDUCE WETTED SURFACE | $3,610 | $180 | Implemented |
CO0487 # 01 Y:2001 | 01 | 2001 | OPTIMIZE PLANT POWER FACTOR | $11,370 | $13,000 | Not Implemented |
CO0487 # 02 Y:2001 | 02 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,240 | $18,000 | Not Implemented |
CO0487 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,950 | $470 | Implemented |
CO0487 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,350 | $60 | Not Implemented |
CO0487 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $260 | $0 | Implemented |
CO0487 # 06 Y:2001 | 06 | 2001 | REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER | $1,420 | $1,150 | Not Implemented |
CO0486 # 01 Y:2001 | 01 | 2001 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $298,800 | $962,500 | Not Implemented |
CO0486 # 02 Y:2001 | 02 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $105,800 | $28,000 | n/a |
CO0486 # 03 Y:2001 | 03 | 2001 | OPTIMIZE PLANT POWER FACTOR | $22,640 | $68,400 | Not Implemented |
CO0486 # 04 Y:2001 | 04 | 2001 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $7,590 | $10,000 | Not Implemented |
CO0486 # 05 Y:2001 | 05 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,140 | $21,600 | n/a |
CO0486 # 06 Y:2001 | 06 | 2001 | INSULATE BARE EQUIPMENT | $2,490 | $6,000 | Not Implemented |
CO0485 # 01 Y:2001 | 01 | 2001 | INSULATE BARE EQUIPMENT | $229,700 | $118,560 | Implemented |
CO0485 # 02 Y:2001 | 02 | 2001 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $59,590 | $30,000 | n/a |
CO0485 # 03 Y:2001 | 03 | 2001 | CONVERT COMBUSTION EQUIPMENT TO BURN OIL | $40,450 | $30,000 | Not Implemented |
CO0485 # 04 Y:2001 | 04 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $27,060 | $28,000 | Implemented |
CO0485 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $23,640 | $18,000 | Implemented |
CO0485 # 06 Y:2001 | 06 | 2001 | OPTIMIZE PLANT POWER FACTOR | $6,730 | $23,000 | Not Implemented |
CO0485 # 07 Y:2001 | 07 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,600 | $5,980 | Implemented |
CO0485 # 08 Y:2001 | 08 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,680 | $8,380 | Implemented |
CO0485 # 09 Y:2001 | 09 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,370 | $2,340 | Implemented |
CO0485 # 10 Y:2001 | 10 | 2001 | AUTOMATE FINISHING PROCESS | $112,750 | $100,000 | Implemented |
CO0484 # 01 Y:2001 | 01 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $8,050 | $8,660 | n/a |