Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,456
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0484 # 02 Y:2001 | 02 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,440 | $1,670 | n/a |
CO0484 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,610 | $390 | n/a |
CO0484 # 04 Y:2001 | 04 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,010 | $4,000 | n/a |
CO0484 # 05 Y:2001 | 05 | 2001 | USE SOLAR HEAT TO HEAT MAKE-UP AIR | $2,110 | $12,600 | n/a |
CO0484 # 06 Y:2001 | 06 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $870 | $30 | n/a |
CO0484 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $520 | $0 | n/a |
CO0484 # 08 Y:2001 | 08 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $34,130 | $7,350 | n/a |
CO0484 # 09 Y:2001 | 09 | 2001 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $14,950 | $0 | n/a |
CO0484 # 10 Y:2001 | 10 | 2001 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $11,240 | $20,000 | n/a |
CO0483 # 01 Y:2001 | 01 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,160 | $0 | Implemented |
CO0483 # 02 Y:2001 | 02 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $500 | $1,000 | Not Implemented |
CO0483 # 03 Y:2001 | 03 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $90 | $0 | Implemented |
CO0483 # 04 Y:2001 | 04 | 2001 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $4,810 | $4,730 | Implemented |
CO0483 # 05 Y:2001 | 05 | 2001 | SELL / OFFER BY-PRODUCT AS ANIMAL FEED | $1,930 | $1,930 | Not Implemented |
CO0482 # 01 Y:2001 | 01 | 2001 | IMPROVE COMBUSTION CONTROL CAPABILITY | $5,120 | $10,000 | Not Implemented |
CO0482 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,800 | $700 | Not Implemented |
CO0482 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,100 | $210 | Implemented |
CO0482 # 04 Y:2001 | 04 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $990 | $370 | Implemented |
CO0482 # 05 Y:2001 | 05 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $900 | $1,500 | Not Implemented |
CO0482 # 06 Y:2001 | 06 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $310 | $60 | Implemented |
CO0482 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $190 | $0 | Not Implemented |
CO0482 # 08 Y:2001 | 08 | 2001 | USE SQUEEGEES, MOPS, AND VACUUMS FOR FLOOR CLEANING | $16,420 | $730 | Not Implemented |
CO0482 # 09 Y:2001 | 09 | 2001 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $730 | $2,000 | Not Implemented |
CO0482 # 10 Y:2001 | 10 | 2001 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $64,110 | $75,000 | Not Implemented |
CO0481 # 01 Y:2001 | 01 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,690 | $2,000 | Not Implemented |