Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,456
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0479 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,970 | $17,900 | n/a |
CO0479 # 02 Y:2000 | 02 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,190 | $2,500 | Implemented |
CO0479 # 03 Y:2000 | 03 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,180 | $12,990 | Not Implemented |
CO0479 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $400 | $110 | Implemented |
CO0479 # 05 Y:2000 | 05 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $390 | $60 | Not Implemented |
CO0479 # 06 Y:2000 | 06 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $179,700 | $0 | Not Implemented |
CO0477 # 01 Y:2000 | 01 | 2000 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,760 | $15,500 | Not Implemented |
CO0477 # 02 Y:2000 | 02 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,530 | $2,000 | Not Implemented |
CO0477 # 03 Y:2000 | 03 | 2000 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,410 | $970 | Not Implemented |
CO0477 # 04 Y:2000 | 04 | 2000 | USE OPTIMUM TEMPERATURE | $1,050 | $200 | Not Implemented |
CO0477 # 05 Y:2000 | 05 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $450 | $1,060 | Not Implemented |
CO0477 # 06 Y:2000 | 06 | 2000 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $220 | $150 | Not Implemented |
CO0477 # 07 Y:2000 | 07 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20 | $0 | Not Implemented |
CO0476 # 01 Y:2000 | 01 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $7,380 | $20,000 | Not Implemented |
CO0476 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,240 | $2,400 | Implemented |
CO0476 # 03 Y:2000 | 03 | 2000 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $2,310 | $1,000 | Implemented |
CO0476 # 04 Y:2000 | 04 | 2000 | USE EVAPORATION TO CONCENTRATE MATERIAL | $62,600 | $18,400 | Implemented |
CO0476 # 05 Y:2000 | 05 | 2000 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $16,290 | $13,500 | Not Implemented |
CO0476 # 06 Y:2000 | 06 | 2000 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $6,490 | $41,000 | Not Implemented |
CO0475 # 01 Y:2000 | 01 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,180 | $4,580 | Not Implemented |
CO0475 # 02 Y:2000 | 02 | 2000 | OPTIMIZE PLANT POWER FACTOR | $3,330 | $5,470 | Not Implemented |
CO0475 # 03 Y:2000 | 03 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,100 | $6,000 | Not Implemented |
CO0475 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $300 | $490 | Implemented |
CO0475 # 05 Y:2000 | 05 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,430 | $0 | Implemented |
CO0475 # 06 Y:2000 | 06 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $34,630 | $100,000 | Implemented |