IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,456

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0479 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,970 $17,900 n/a
CO0479 # 02 Y:2000 02 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,190 $2,500 Implemented
CO0479 # 03 Y:2000 03 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,180 $12,990 Not Implemented
CO0479 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $400 $110 Implemented
CO0479 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $390 $60 Not Implemented
CO0479 # 06 Y:2000 06 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $179,700 $0 Not Implemented
CO0477 # 01 Y:2000 01 2000 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,760 $15,500 Not Implemented
CO0477 # 02 Y:2000 02 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,530 $2,000 Not Implemented
CO0477 # 03 Y:2000 03 2000 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,410 $970 Not Implemented
CO0477 # 04 Y:2000 04 2000 USE OPTIMUM TEMPERATURE $1,050 $200 Not Implemented
CO0477 # 05 Y:2000 05 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $450 $1,060 Not Implemented
CO0477 # 06 Y:2000 06 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $220 $150 Not Implemented
CO0477 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20 $0 Not Implemented
CO0476 # 01 Y:2000 01 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,380 $20,000 Not Implemented
CO0476 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,240 $2,400 Implemented
CO0476 # 03 Y:2000 03 2000 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $2,310 $1,000 Implemented
CO0476 # 04 Y:2000 04 2000 USE EVAPORATION TO CONCENTRATE MATERIAL $62,600 $18,400 Implemented
CO0476 # 05 Y:2000 05 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $16,290 $13,500 Not Implemented
CO0476 # 06 Y:2000 06 2000 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $6,490 $41,000 Not Implemented
CO0475 # 01 Y:2000 01 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,180 $4,580 Not Implemented
CO0475 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $3,330 $5,470 Not Implemented
CO0475 # 03 Y:2000 03 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,100 $6,000 Not Implemented
CO0475 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $300 $490 Implemented
CO0475 # 05 Y:2000 05 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,430 $0 Implemented
CO0475 # 06 Y:2000 06 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $34,630 $100,000 Implemented