IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,456

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0438 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,090 $100 Implemented
CO0437 # 01 Y:1999 01 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,300 $7,500 Not Implemented
CO0437 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,280 $1,000 Not Implemented
CO0437 # 03 Y:1999 03 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,190 $2,720 Not Implemented
CO0437 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90 $958 Not Implemented
CO0437 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $790 $1,650 Not Implemented
CO0437 # 06 Y:1999 06 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $104,000 $1,500 Not Implemented
CO0437 # 07 Y:1999 07 1999 $59,470 $20,000 Not Implemented
CO0436 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $141 $566 Implemented
CO0436 # 02 Y:1999 02 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $180 $800 Not Implemented
CO0436 # 03 Y:1999 03 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $5,460 $0 Implemented
CO0436 # 04 Y:1999 04 1999 DEVELOP STANDARD OPERATING PROCEDURES $31,100 $0 Implemented
CO0436 # 05 Y:1999 05 1999 INSTALL AN UNINTERUPTABLE POWER SUPPLY $19,090 $75,000 Not Implemented
CO0435 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,870 $14,850 Not Implemented
CO0435 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,380 $2,000 Implemented
CO0435 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $570 $710 Not Implemented
CO0435 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $370 $500 Implemented
CO0435 # 05 Y:1999 05 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $310 $100 Implemented
CO0435 # 06 Y:1999 06 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $210 $134 Implemented
CO0435 # 07 Y:1999 07 1999 MODIFY STARTUP/SHUTDOWN TIMES $10,920 $0 Not Implemented
CO0435 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $3,640 $8,000 Not Implemented
CO0434 # 01 Y:1999 01 1999 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,340 $100 n/a
CO0434 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $490 $710 n/a
CO0434 # 03 Y:1999 03 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $480 $1,400 n/a
CO0434 # 04 Y:1999 04 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $380 $60 n/a