Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,456
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0438 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,090 | $100 | Implemented |
CO0437 # 01 Y:1999 | 01 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,300 | $7,500 | Not Implemented |
CO0437 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,280 | $1,000 | Not Implemented |
CO0437 # 03 Y:1999 | 03 | 1999 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,190 | $2,720 | Not Implemented |
CO0437 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $90 | $958 | Not Implemented |
CO0437 # 05 Y:1999 | 05 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $790 | $1,650 | Not Implemented |
CO0437 # 06 Y:1999 | 06 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $104,000 | $1,500 | Not Implemented |
CO0437 # 07 Y:1999 | 07 | 1999 | $59,470 | $20,000 | Not Implemented | |
CO0436 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $141 | $566 | Implemented |
CO0436 # 02 Y:1999 | 02 | 1999 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $180 | $800 | Not Implemented |
CO0436 # 03 Y:1999 | 03 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $5,460 | $0 | Implemented |
CO0436 # 04 Y:1999 | 04 | 1999 | DEVELOP STANDARD OPERATING PROCEDURES | $31,100 | $0 | Implemented |
CO0436 # 05 Y:1999 | 05 | 1999 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $19,090 | $75,000 | Not Implemented |
CO0435 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,870 | $14,850 | Not Implemented |
CO0435 # 02 Y:1999 | 02 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,380 | $2,000 | Implemented |
CO0435 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $570 | $710 | Not Implemented |
CO0435 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $370 | $500 | Implemented |
CO0435 # 05 Y:1999 | 05 | 1999 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $310 | $100 | Implemented |
CO0435 # 06 Y:1999 | 06 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $210 | $134 | Implemented |
CO0435 # 07 Y:1999 | 07 | 1999 | MODIFY STARTUP/SHUTDOWN TIMES | $10,920 | $0 | Not Implemented |
CO0435 # 08 Y:1999 | 08 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $3,640 | $8,000 | Not Implemented |
CO0434 # 01 Y:1999 | 01 | 1999 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,340 | $100 | n/a |
CO0434 # 02 Y:1999 | 02 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $490 | $710 | n/a |
CO0434 # 03 Y:1999 | 03 | 1999 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $480 | $1,400 | n/a |
CO0434 # 04 Y:1999 | 04 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $380 | $60 | n/a |