Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
164
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0430 # 05 Y:1998 | 05 | 1998 | SELL COMBUSTIBLE WASTE | $15,970 | $56,700 | Implemented |
CO0430 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,060 | $12,077 | Implemented |
CO0430 # 03 Y:1998 | 03 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,470 | $1,280 | Implemented |
CO0430 # 04 Y:1998 | 04 | 1998 | USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS | $-210 | $2,000 | Implemented |
CO0430 # 06 Y:1998 | 06 | 1998 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $674,900 | $1,645,000 | Not Implemented |
CO0430 # 02 Y:1998 | 02 | 1998 | INSTALL TURBULATORS | $1,770 | $5,750 | Not Implemented |
CO0429 # 05 Y:1998 | 05 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $730 | $280 | Not Implemented |
CO0429 # 03 Y:1998 | 03 | 1998 | ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT | $2,930 | $800 | Not Implemented |
CO0429 # 02 Y:1998 | 02 | 1998 | CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE | $4,860 | $0 | Implemented |
CO0429 # 04 Y:1998 | 04 | 1998 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $6,000 | $10,160 | Implemented |
CO0429 # 01 Y:1998 | 01 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $840 | $1,000 | Implemented |
CO0428 # 04 Y:1998 | 04 | 1998 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $500 | $1,750 | Not Implemented |
CO0428 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $470 | $50 | Not Implemented |
CO0428 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,428 | $8,036 | Not Implemented |
CO0428 # 02 Y:1998 | 02 | 1998 | DISCONNECT BALLASTS | $3,050 | $350 | Not Implemented |
CO0427 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $500 | $2,082 | Implemented |
CO0427 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $240 | $40 | Implemented |
CO0427 # 07 Y:1998 | 07 | 1998 | MAINTAIN/ENLARGE A STOCK OF SPARE PARTS | $18,250 | $27,000 | Implemented |
CO0427 # 02 Y:1998 | 02 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $290 | $1,000 | Implemented |
CO0427 # 06 Y:1998 | 06 | 1998 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $6,080 | $30,000 | Not Implemented |
CO0427 # 04 Y:1998 | 04 | 1998 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $210 | $0 | Not Implemented |
CO0427 # 05 Y:1998 | 05 | 1998 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $34,700 | $300,000 | Not Implemented |
CO0426 # 07 Y:1998 | 07 | 1998 | BURN WASTE OIL FOR HEAT | $1,620 | $5,420 | Implemented |
CO0426 # 04 Y:1998 | 04 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,420 | $4,303 | Implemented |
CO0426 # 06 Y:1998 | 06 | 1998 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $2,380 | $6,000 | Not Implemented |