IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0455 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $430 $440 n/a
CO0455 # 03 Y:1999 03 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,640 $0 n/a
CO0455 # 01 Y:1999 01 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $41,240 $10,000 n/a
CO0455 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,020 $220 n/a
CO0455 # 05 Y:1999 05 1999 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $39,330 $0 n/a
CO0455 # 06 Y:1999 06 1999 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $2,180 $3,500 n/a
CO0455 # 07 Y:1999 07 1999 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $39,560 $1,000 n/a
CO0453 # 05 Y:1999 05 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $670 $320 Not Implemented
CO0454 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,460 $7,500 Implemented
CO0454 # 04 Y:1999 04 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,010 $0 Implemented
CO0454 # 08 Y:1999 08 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $350 $490 Implemented
CO0453 # 06 Y:1999 06 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $320 $890 Not Implemented
CO0453 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $2,380 $2,150 Not Implemented
CO0454 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $392 $0 Implemented
CO0453 # 01 Y:1999 01 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $5,250 $1,380 Not Implemented
CO0453 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $800 $240 Not Implemented
CO0454 # 07 Y:1999 07 1999 MINIMIZE WATER USAGE $1,480 $640 Not Implemented
CO0454 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,630 $80 Implemented
CO0454 # 01 Y:1999 01 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $8,180 $0 Not Implemented
CO0454 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $610 $30 Implemented
CO0453 # 02 Y:1999 02 1999 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,130 $10,000 Not Implemented
CO0452 # 07 Y:1999 07 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $130 $0 n/a
CO0452 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10 $0 n/a
CO0452 # 06 Y:1999 06 1999 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $140 $0 n/a
CO0452 # 05 Y:1999 05 1999 USE A RAG RECYCLE SERVICE $350 $0 n/a