Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,142
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0259 # 03 Y:2025 | 03 | 2025 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $3,091 | $13,000 | n/a |
DL0259 # 05 Y:2025 | 05 | 2025 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $10,050 | $40,000 | n/a |
DL0259 # 01 Y:2025 | 01 | 2025 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $45,458 | $19,000 | n/a |
DL0259 # 02 Y:2025 | 02 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,620 | $30,000 | n/a |
DL0259 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,217 | $5,500 | n/a |
DL0258 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $2,112 | $5,500 | n/a |
DL0258 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,102 | $3,500 | n/a |
DL0258 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,565 | $200 | n/a |
DL0258 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,808 | $25,000 | n/a |
DL0257 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $58,383 | $470,000 | n/a |
DL0257 # 04 Y:2025 | 04 | 2025 | USE OPTIMUM TEMPERATURE | $1,329 | $0 | n/a |
DL0257 # 02 Y:2025 | 02 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,000 | $0 | n/a |
DL0257 # 05 Y:2025 | 05 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $291 | $131 | n/a |
DL0257 # 03 Y:2025 | 03 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $343 | $0 | n/a |
DL0256 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,828 | $5,900 | n/a |
DL0256 # 08 Y:2025 | 08 | 2025 | USE HEAT PUMP FOR SPACE CONDITIONING | $25,337 | $50,000 | n/a |
DL0256 # 07 Y:2025 | 07 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,219 | $5,200 | n/a |
DL0256 # 03 Y:2025 | 03 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,894 | $5,000 | n/a |
DL0256 # 06 Y:2025 | 06 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $589 | $3,250 | n/a |
DL0256 # 04 Y:2025 | 04 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $16,477 | $10,000 | n/a |
DL0256 # 01 Y:2025 | 01 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,286 | $0 | n/a |
DL0256 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,171 | $16,500 | n/a |
DL0255 # 06 Y:2025 | 06 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,300 | $800 | n/a |
DL0255 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $246,492 | $36,000 | n/a |
DL0255 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,190 | $5,500 | n/a |