Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,142
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0225 # 02 Y:2023 | 02 | 2023 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $6,327 | $0 | Implemented |
DL0225 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,072 | $500 | Implemented |
DL0225 # 04 Y:2023 | 04 | 2023 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $15,801 | $4,102 | Not Implemented |
DL0225 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,896 | $0 | Not Implemented |
DL0225 # 06 Y:2023 | 06 | 2023 | INSULATE BARE EQUIPMENT | $4,181 | $6,480 | Not Implemented |
DL0225 # 07 Y:2023 | 07 | 2023 | IMPROVE HANDLING PRACTICES | $25,825 | $10,000 | Implemented |
DL0225 # 08 Y:2023 | 08 | 2023 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $9,068 | $28,750 | Implemented |
DL0225 # 09 Y:2023 | 09 | 2023 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $18,229 | $60,000 | Not Implemented |
DL0224 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $25,584 | $18,000 | Not Implemented |
DL0224 # 02 Y:2023 | 02 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $18,258 | $76,600 | Not Implemented |
DL0224 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN HIGH PRESSURE REDUCING STATIONS | $14,800 | $70,000 | Not Implemented |
DL0224 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,382 | $780 | Not Implemented |
DL0223 # 01 Y:2023 | 01 | 2023 | ELIMINATE/REDUCE AN OPERATION | $9,025 | $0 | Implemented |
DL0223 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,437 | $1,030 | Implemented |
DL0223 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,840 | $2,800 | Not Implemented |
DL0223 # 04 Y:2023 | 04 | 2023 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $994 | $4,800 | Implemented |
DL0223 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $490,980 | $10,000 | Not Implemented |
DL0223 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,906 | $7,955 | Not Implemented |
DL0222 # 01 Y:2023 | 01 | 2023 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $1,009 | $42 | Not Implemented |
DL0222 # 02 Y:2023 | 02 | 2023 | INSTALL SET-BACK TIMERS | $245 | $130 | Not Implemented |
DL0222 # 03 Y:2023 | 03 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $338 | $9,500 | Implemented |
DL0222 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $413 | $0 | Not Implemented |
DL0222 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $402 | $871 | Not Implemented |
DL0222 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,097 | $3,000 | Not Implemented |
DL0222 # 07 Y:2023 | 07 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,366 | $25,000 | Implemented |