IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0242 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,049 $191 n/a
DL0242 # 04 Y:2024 04 2024 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $4,290 $11,200 n/a
DL0242 # 03 Y:2024 03 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $11,703 $0 n/a
DL0242 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,258 $0 n/a
DL0242 # 01 Y:2024 01 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,043 $0 n/a
DL0239 # 03 Y:2024 03 2024 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $37,050 $110,000 n/a
DL0239 # 01 Y:2024 01 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $17,306 $1,250 n/a
DL0239 # 02 Y:2024 02 2024 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,623 $17,500 n/a
DL0239 # 04 Y:2024 04 2024 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $61,029 $10,000 n/a
DL0239 # 05 Y:2024 05 2024 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,543 $2,247 n/a
DL0239 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $397,405 $140,000 n/a
DL0239 # 07 Y:2024 07 2024 UPGRADE CONTROLS ON COMPRESSORS $61,587 $28,225 n/a
DL0239 # 08 Y:2024 08 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42,185 $51,431 n/a
DL0239 # 09 Y:2024 09 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $44,586 $1,934 n/a
DL0227 # 06 Y:2023 06 2023 INSTALL TIMERS AND/OR THERMOSTATS $5,836 $30,292 Implemented
DL0227 # 05 Y:2023 05 2023 USE RADIANT HEATER FOR SPOT HEATING $3,640 $10,608 Not Implemented
DL0227 # 04 Y:2023 04 2023 USE OPTIMUM TEMPERATURE $6,362 $0 Implemented
DL0227 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,027 $552 Not Implemented
DL0227 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,653 $0 Implemented
DL0227 # 01 Y:2023 01 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,298 $0 Implemented
DL0225 # 06 Y:2023 06 2023 INSULATE BARE EQUIPMENT $4,181 $6,480 Not Implemented
DL0225 # 09 Y:2023 09 2023 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $18,229 $60,000 Not Implemented
DL0225 # 08 Y:2023 08 2023 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $9,068 $28,750 Implemented
DL0225 # 07 Y:2023 07 2023 IMPROVE HANDLING PRACTICES $25,825 $10,000 Implemented
DL0225 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,896 $0 Not Implemented