Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
43
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0239 # 03 Y:2024 | 03 | 2024 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $37,050 | $110,000 | n/a |
DL0239 # 05 Y:2024 | 05 | 2024 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $9,543 | $2,247 | n/a |
DL0239 # 02 Y:2024 | 02 | 2024 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $6,623 | $17,500 | n/a |
DL0239 # 01 Y:2024 | 01 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $17,306 | $1,250 | n/a |
DL0239 # 09 Y:2024 | 09 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $44,586 | $1,934 | n/a |
DL0239 # 08 Y:2024 | 08 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $42,185 | $51,431 | n/a |
DL0239 # 07 Y:2024 | 07 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $61,587 | $28,225 | n/a |
DL0239 # 04 Y:2024 | 04 | 2024 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $61,029 | $10,000 | n/a |
DL0239 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $397,405 | $140,000 | n/a |
DL0227 # 05 Y:2023 | 05 | 2023 | USE RADIANT HEATER FOR SPOT HEATING | $3,640 | $10,608 | n/a |
DL0227 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,653 | $0 | n/a |
DL0227 # 04 Y:2023 | 04 | 2023 | USE OPTIMUM TEMPERATURE | $6,362 | $0 | n/a |
DL0227 # 06 Y:2023 | 06 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $5,836 | $30,292 | n/a |
DL0227 # 01 Y:2023 | 01 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,298 | $0 | n/a |
DL0227 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,027 | $552 | n/a |
DL0225 # 06 Y:2023 | 06 | 2023 | INSULATE BARE EQUIPMENT | $4,181 | $6,480 | n/a |
DL0225 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,896 | $0 | n/a |
DL0225 # 04 Y:2023 | 04 | 2023 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $15,801 | $4,102 | n/a |
DL0225 # 07 Y:2023 | 07 | 2023 | IMPROVE HANDLING PRACTICES | $25,825 | $10,000 | n/a |
DL0225 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,072 | $500 | n/a |
DL0225 # 02 Y:2023 | 02 | 2023 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $6,327 | $0 | n/a |
DL0225 # 01 Y:2023 | 01 | 2023 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $6,327 | $0 | n/a |
DL0225 # 08 Y:2023 | 08 | 2023 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $9,068 | $28,750 | n/a |
DL0225 # 09 Y:2023 | 09 | 2023 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $18,229 | $60,000 | n/a |
DL0211 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,560 | $28,388 | Not Implemented |