IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

396

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0698 # 05 Y:2000 05 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $108,000 $160,000 Not Implemented
GT0698 # 06 Y:2000 06 2000 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $59,243 $300,000 Implemented
GT0698 # 08 Y:2000 08 2000 RECOVER WASTE HEAT FROM EQUIPMENT $29,275 $55,000 Not Implemented
GT0698 # 09 Y:2000 09 2000 FILTER AND REUSE HYDRAULIC OIL $3,712 $6,200 Not Implemented
GT0698 # 10 Y:2000 10 2000 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $18,139 $77,275 Not Implemented
GT0661 # 05 Y:1999 05 1999 FILTER AND REUSE HYDRAULIC OIL $684 $1,000 Not Implemented
GT0661 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $20,275 $4,960 Not Implemented
GT0661 # 02 Y:1999 02 1999 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,938 $300 Implemented
GT0661 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,740 $750 Not Implemented
GT0661 # 04 Y:1999 04 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $457 $994 Not Implemented
GT0661 # 06 Y:1999 06 1999 REDUCE SCRAP PRODUCTION $215,560 $112,500 Implemented
GT0661 # 07 Y:1999 07 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $673,610 $245,000 Implemented
GT0640 # 09 Y:1998 09 1998 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $36,424 $92,125 Not Implemented
GT0640 # 08 Y:1998 08 1998 METER WASTE WATER $7,180 $8,000 Implemented
GT0640 # 07 Y:1998 07 1998 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $7,741 $7,900 Implemented
GT0640 # 06 Y:1998 06 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,660 $5,675 Implemented
GT0640 # 05 Y:1998 05 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $5,590 $200 Not Implemented
GT0640 # 04 Y:1998 04 1998 UPGRADE CONTROLS ON COMPRESSORS $7,000 $5,000 Implemented
GT0640 # 03 Y:1998 03 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,249 $0 Not Implemented
GT0640 # 02 Y:1998 02 1998 COMBINE UTILITY METERS $5,560 $0 Implemented
GT0640 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $28,530 $45,720 Implemented
GT0637 # 03 Y:1998 03 1998 AIR CONDITION ONLY SPACE NECESSARY $1,154 $2,610 Implemented
GT0637 # 04 Y:1998 04 1998 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $308,000 $20,000 Implemented
GT0637 # 05 Y:1998 05 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,033 $3,000 Implemented
GT0637 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $580 $450 Implemented