IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,675

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0200 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $944 $1,500 Not Implemented
HO0200 # 04 Y:1999 04 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $451 $100 Not Implemented
HO0200 # 05 Y:1999 05 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,395 $4,800 Implemented
HO0200 # 06 Y:1999 06 1999 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $14,628 $8,000 Not Implemented
HO0200 # 07 Y:1999 07 1999 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $25,402 $22,000 Not Implemented
HO0200 # 08 Y:1999 08 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $10,000 $35,000 Not Implemented
HO0199 # 01 Y:1999 01 1999 INSTALL OCCUPANCY SENSORS $450 $1,200 Not Implemented
HO0199 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,100 $0 Implemented
HO0199 # 03 Y:1999 03 1999 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,627 $1,300 Implemented
HO0199 # 04 Y:1999 04 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,503 $750 Implemented
HO0199 # 05 Y:1999 05 1999 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $2,808 $5,000 Implemented
HO0199 # 06 Y:1999 06 1999 INSTALL SYSTEM TO COLLECT SCRAP $4,680 $150 Implemented
HO0199 # 07 Y:1999 07 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $26,520 $28,000 Not Implemented
HO0198 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,422 $14,000 Implemented
HO0198 # 02 Y:1999 02 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,100 $0 Implemented
HO0198 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $234 $398 Implemented
HO0198 # 04 Y:1999 04 1999 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $6,813 $27,000 Not Implemented
HO0198 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,667 $400 Implemented
HO0198 # 06 Y:1999 06 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,661 $500 Implemented
HO0198 # 07 Y:1999 07 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $4,800 $5,000 Implemented
HO0198 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $6,228 $10,000 Implemented
HO0197 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,532 $3,250 Implemented
HO0197 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $513 $492 Implemented
HO0197 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $2,672 $144 Not Implemented
HO0197 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $5,901 $324 Implemented