IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,675

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0176 # 07 Y:1998 07 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $4,000 $500 Implemented
HO0176 # 08 Y:1998 08 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $12,800 $500 Implemented
HO0176 # 09 Y:1998 09 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $833 $500 Implemented
HO0174 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,898 $20,287 Implemented
HO0174 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $875 $2,308 Not Implemented
HO0174 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,918 $1,500 Implemented
HO0174 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $4,561 $7,680 Not Implemented
HO0174 # 05 Y:1998 05 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $7,800 $8,000 Not Implemented
HO0174 # 06 Y:1998 06 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $24,960 $5,000 Not Implemented
HO0174 # 07 Y:1998 07 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $7,800 $0 Not Implemented
HO0174 # 08 Y:1998 08 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,300 $0 Implemented
HO0173 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,124 $17,821 Not Implemented
HO0173 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,250 $1,569 Not Implemented
HO0173 # 03 Y:1998 03 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,033 $120 Not Implemented
HO0173 # 04 Y:1998 04 1998 INSTALL OCCUPANCY SENSORS $2,983 $600 Not Implemented
HO0173 # 05 Y:1998 05 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $648 $1,073 Not Implemented
HO0173 # 06 Y:1998 06 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $492 $1,214 Not Implemented
HO0173 # 07 Y:1998 07 1998 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $4,478 $500 Not Implemented
HO0173 # 08 Y:1998 08 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $19,788 $500 Not Implemented
HO0173 # 09 Y:1998 09 1998 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,463 $0 Not Implemented
HO0172 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,879 $13,312 Implemented
HO0172 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $575 $20 Implemented
HO0172 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,492 $300 Implemented
HO0172 # 04 Y:1998 04 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $708 $990 Not Implemented
HO0172 # 05 Y:1998 05 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $316 $47 Implemented