IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,675

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0172 # 06 Y:1998 06 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,907 $1,500 Not Implemented
HO0172 # 07 Y:1998 07 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $500 $2,000 Not Implemented
HO0171 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,328 $30,330 Not Implemented
HO0171 # 02 Y:1998 02 1998 INSTALL OCCUPANCY SENSORS $5,886 $2,000 Not Implemented
HO0171 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,021 $5,131 Implemented
HO0171 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,188 $50 Implemented
HO0171 # 05 Y:1998 05 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,531 $3,500 Not Implemented
HO0171 # 06 Y:1998 06 1998 INSULATE BARE EQUIPMENT $383 $190 Not Implemented
HO0171 # 07 Y:1998 07 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $54,070 $24,050 Not Implemented
HO0171 # 08 Y:1998 08 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $64,007 $2,200 Implemented
HO0171 # 09 Y:1998 09 1998 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,116 $1,000 Implemented
HO0170 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,110 $35,934 Implemented
HO0170 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $652 $500 Implemented
HO0170 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $920 $20 Implemented
HO0170 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $455 $60 Implemented
HO0170 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,250 $200 Not Implemented
HO0170 # 06 Y:1998 06 1998 USE RADIANT HEATER FOR SPOT HEATING $3,205 $9,600 Implemented
HO0170 # 07 Y:1998 07 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $774 $750 Implemented
HO0170 # 08 Y:1998 08 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $4,800 $5,200 Implemented
HO0170 # 09 Y:1998 09 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $611 $500 Implemented
HO0170 # 10 Y:1998 10 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $15,000 $1,040 Not Implemented
HO0170 # 11 Y:1998 11 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $24,440 $500 Not Implemented
HO0170 # 12 Y:1998 12 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $3,055 $2,500 Not Implemented
HO0169 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,077 $6,192 Implemented
HO0169 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,676 $4,900 Implemented