IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

396

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0193 # 07 Y:1999 07 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,872 $3,500 Not Implemented
HO0193 # 08 Y:1999 08 1999 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $2,000 $10,000 Not Implemented
HO0192 # 07 Y:1999 07 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $6,000 $5,000 Not Implemented
HO0192 # 10 Y:1999 10 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,000 $1,000 Implemented
HO0192 # 09 Y:1999 09 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $2,400 $1,000 Not Implemented
HO0192 # 08 Y:1999 08 1999 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $1,200 $1,000 Not Implemented
HO0192 # 06 Y:1999 06 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $960 $600 Implemented
HO0192 # 05 Y:1999 05 1999 INSTALL REPLACEMENT DOORS $562 $700 Implemented
HO0192 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $2,083 $520 Implemented
HO0192 # 03 Y:1999 03 1999 USE RADIANT HEATER FOR SPOT HEATING $2,678 $4,800 Not Implemented
HO0192 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $409 $1,120 Implemented
HO0192 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,539 $8,289 Not Implemented
HO0190 # 05 Y:1999 05 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,100 $360 Implemented
HO0190 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,524 $2,500 Implemented
HO0190 # 03 Y:1999 03 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $39,503 $85,000 Not Implemented
HO0190 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,478 $39,600 Not Implemented
HO0190 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,715 $15,311 Not Implemented
HO0189 # 07 Y:1998 07 1998 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $8,634 $5,000 Not Implemented
HO0189 # 06 Y:1998 06 1998 MINIMIZE WATER USAGE $2,000 $2,000 Implemented
HO0189 # 05 Y:1998 05 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $9,400 $500 Implemented
HO0189 # 04 Y:1998 04 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $14,000 $20,000 Not Implemented
HO0189 # 03 Y:1998 03 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $6,631 $10,500 Implemented
HO0189 # 02 Y:1998 02 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,097 $5,180 Not Implemented
HO0189 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,434 $10,179 Implemented
HO0186 # 06 Y:1998 06 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $3,900 $1,000 Implemented