IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

810

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0413 # 09 Y:2007 09 2007 RECOVER WASTE HEAT FROM EQUIPMENT $1,640 $2,160 Not Implemented
IA0413 # 10 Y:2007 10 2007 COVER OPEN TANKS $3,772 $1,500 Not Implemented
IA0413 # 11 Y:2007 11 2007 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $677 $80 Implemented
IA0413 # 12 Y:2007 12 2007 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $31,051 $4,000 Implemented
IA0404 # 01 Y:2007 01 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,930 $30 Implemented
IA0404 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,029 $1,440 Implemented
IA0404 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,817 $9,533 Implemented
IA0404 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,557 $38,557 Implemented
IA0404 # 05 Y:2007 05 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,428 $495 Implemented
IA0404 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $5,712 $592 Not Implemented
IA0404 # 07 Y:2007 07 2007 REDUCE VENTILATION AIR $24,436 $4,500 Implemented
IA0401 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,847 $47 Implemented
IA0401 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,645 $2,882 Implemented
IA0401 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,417 $3,991 Implemented
IA0401 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,519 $194 Implemented
IA0401 # 05 Y:2006 05 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $16,486 $2,500 Implemented
IA0401 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,783 $1,475 Implemented
IA0401 # 07 Y:2006 07 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,437 $1,550 Not Implemented
IA0401 # 08 Y:2006 08 2006 INSULATE BARE EQUIPMENT $1,801 $444 Implemented
IA0401 # 09 Y:2006 09 2006 RECOVER WASTE HEAT FROM EQUIPMENT $7,280 $25,700 Implemented
IA0401 # 10 Y:2006 10 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,235 $18 Not Implemented
IA0399 # 01 Y:2006 01 2006 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $608,664 $200,000 Not Implemented
IA0399 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,793 $6,686 Not Implemented
IA0399 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,887 $1,236 Not Implemented
IA0399 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,559 $2,000 Implemented