IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,660

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0257 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $396 $60 Implemented
IA0257 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $889 $369 Implemented
IA0257 # 07 Y:2000 07 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $81,900 $150 Implemented
IA0257 # 08 Y:2000 08 2000 MINIMIZE WATER USAGE $28,444 $19,000 Not Implemented
IA0257 # 09 Y:2000 09 2000 RECOVER AND REUSE COOLING WATER $23,394 $15,250 Implemented
IA0257 # 10 Y:2000 10 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $234,828 $126,125 Not Implemented
IA0257 # 11 Y:2000 11 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $7,188 $3,010 Implemented
IA0253 # 01 Y:2000 01 2000 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $47,476 $0 Not Implemented
IA0253 # 02 Y:2000 02 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $12,000 $14,500 Implemented
IA0253 # 03 Y:2000 03 2000 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $33,000 $20,000 Not Implemented
IA0253 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,349 $0 Not Implemented
IA0253 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,005 $158 Implemented
IA0253 # 06 Y:2000 06 2000 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $1,716 $6 Not Implemented
IA0250 # 01 Y:2000 01 2000 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,769 $593 Not Implemented
IA0250 # 02 Y:2000 02 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $682 $1,400 Implemented
IA0250 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $1,751 $2,456 Implemented
IA0250 # 04 Y:2000 04 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $751 $0 Implemented
IA0250 # 05 Y:2000 05 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $579 $80 Implemented
IA0250 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $175 $154 Not Implemented
IA0250 # 07 Y:2000 07 2000 MOVE PRODUCT USING MECHANICAL MEANS $11,261 $16,930 Not Implemented
IA0251 # 01 Y:2000 01 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,446 $6,216 Not Implemented
IA0251 # 02 Y:2000 02 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $6,280 $0 Implemented
IA0251 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,901 $13,746 Implemented
IA0251 # 04 Y:2000 04 2000 INSTALL OCCUPANCY SENSORS $1,574 $3,390 Not Implemented
IA0251 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,361 $0 Not Implemented