IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,057

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0038 # 01 Y:1992 01 1992 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,039 $9,600 Not Implemented
IA0038 # 02 Y:1992 02 1992 RECOVER WASTE HEAT FROM EQUIPMENT $1,673 $2,484 Not Implemented
IA0038 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,907 $150 Implemented
IA0038 # 04 Y:1992 04 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $848 $25 Not Implemented
IA0038 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $693 $1,875 Not Implemented
IA0038 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $1,925 $1,926 Not Implemented
IA0039 # 01 Y:1992 01 1992 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $6,617 $15,000 Not Implemented
IA0039 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $744 $600 Not Implemented
IA0039 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,769 $360 Not Implemented
IA0039 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $322 $73 Not Implemented
IA0040 # 01 Y:1992 01 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $25,896 $1,200 Not Implemented
IA0040 # 02 Y:1992 02 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,369 $18,000 Not Implemented
IA0040 # 03 Y:1992 03 1992 DIRECT WARMEST AIR TO COMBUSTION INTAKE $5,208 $650 Not Implemented
IA0040 # 04 Y:1992 04 1992 INSULATE BARE EQUIPMENT $1,722 $4,219 Not Implemented
IA0040 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,718 $2,220 Implemented
IA0040 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $890 $1,701 Not Implemented
IA0040 # 07 Y:1992 07 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $530 $50 Implemented
IA0041 # 01 Y:1992 01 1992 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $20,185 $81,000 Implemented
IA0041 # 02 Y:1992 02 1992 INSTALL TIMERS AND/OR THERMOSTATS $8,582 $3,000 Implemented
IA0041 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,582 $1,106 Implemented
IA0041 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $148 $414 Not Implemented
IA0041 # 05 Y:1992 05 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $81 $188 Implemented
IA0041 # 06 Y:1992 06 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $163 $150 Not Implemented
IA0042 # 01 Y:1992 01 1992 DIRECT WARMEST AIR TO COMBUSTION INTAKE $25,018 $6,000 Implemented
IA0042 # 02 Y:1992 02 1992 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $11,110 $3,925 Not Implemented