IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,660

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0166 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,401 $444 Implemented
IA0166 # 06 Y:1997 06 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $318 $908 Implemented
IA0166 # 07 Y:1997 07 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,127 $1,532 Implemented
IA0166 # 08 Y:1997 08 1997 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,281 $0 Implemented
IA0166 # 09 Y:1997 09 1997 OPTIMIZE PLANT POWER FACTOR $1,096 $4,700 Implemented
IA0166 # 10 Y:1997 10 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $948 $3,374 Implemented
IA0166 # 11 Y:1997 11 1997 INSTALL OCCUPANCY SENSORS $471 $906 Not Implemented
IA0168 # 01 Y:1997 01 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,097 $10,500 Implemented
IA0168 # 02 Y:1997 02 1997 REDUCE SCRAP PRODUCTION $6,471 $91 Not Implemented
IA0168 # 03 Y:1997 03 1997 USE LESS WASTEFUL PACKAGING $12,167 $0 Implemented
IA0168 # 04 Y:1997 04 1997 INSTALL OCCUPANCY SENSORS $410 $843 Not Implemented
IA0168 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $79 $86 Not Implemented
IA0165 # 01 Y:1997 01 1997 REDUCE SCRAP PRODUCTION $22,752 $48 Implemented
IA0165 # 02 Y:1997 02 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $12,823 $3,500 Implemented
IA0165 # 03 Y:1997 03 1997 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $9,895 $4,200 Not Implemented
IA0165 # 04 Y:1997 04 1997 CONVERT TO ELECTROSTATIC POWDER COATING $3,771 $2,598 Not Implemented
IA0165 # 05 Y:1997 05 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,788 $12 Implemented
IA0165 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,421 $167 Implemented
IA0165 # 07 Y:1997 07 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,431 $1,500 Implemented
IA0165 # 08 Y:1997 08 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $160 $0 Not Implemented
IA0164 # 02 Y:1997 02 1997 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $17,815 $19,000 Not Implemented
IA0164 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $944 $898 Implemented
IA0164 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,481 $268 Implemented
IA0164 # 05 Y:1997 05 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,647 $20 Implemented
IA0164 # 06 Y:1997 06 1997 UTILIZE A LESS EXPENSIVE COOLING METHOD $5,860 $1,788 Implemented