Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,660
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0435 # 07 Y:2008 | 07 | 2008 | INSTALL OCCUPANCY SENSORS | $552 | $1,309 | Implemented |
IA0435 # 08 Y:2008 | 08 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,096 | $317 | Not Implemented |
IA0435 # 09 Y:2008 | 09 | 2008 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,838 | $15 | Implemented |
IA0434 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,207 | $217,391 | Implemented |
IA0434 # 02 Y:2008 | 02 | 2008 | ADD AREA LIGHTING SWITCHES | $4,676 | $1,417 | Implemented |
IA0434 # 03 Y:2008 | 03 | 2008 | INSTALL OCCUPANCY SENSORS | $1,439 | $616 | Implemented |
IA0434 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,457 | $25 | Not Implemented |
IA0434 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,833 | $596 | Implemented |
IA0434 # 06 Y:2008 | 06 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,490 | $1,059 | Implemented |
IA0434 # 07 Y:2008 | 07 | 2008 | INSULATE BARE EQUIPMENT | $1,153 | $600 | Implemented |
IA0434 # 08 Y:2008 | 08 | 2008 | INSULATE BARE EQUIPMENT | $764 | $270 | Not Implemented |
IA0434 # 09 Y:2008 | 09 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,060 | $15,120 | Implemented |
IA0434 # 10 Y:2008 | 10 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,536 | $280 | Not Implemented |
IA0434 # 11 Y:2008 | 11 | 2008 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $12,653 | $7,425 | Implemented |
IA0434 # 12 Y:2008 | 12 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,902 | $33,345 | Not Implemented |
IA0433 # 01 Y:2008 | 01 | 2008 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $52,036 | $0 | Not Implemented |
IA0433 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,622 | $459 | Implemented |
IA0433 # 03 Y:2008 | 03 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,886 | $832 | Implemented |
IA0433 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,195 | $54 | Implemented |
IA0433 # 05 Y:2008 | 05 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,871 | $1,700 | Not Implemented |
IA0433 # 06 Y:2008 | 06 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,324 | $37,346 | Not Implemented |
IA0433 # 07 Y:2008 | 07 | 2008 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,364 | $4,000 | Implemented |
IA0433 # 08 Y:2008 | 08 | 2008 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $587 | $142 | Implemented |
IA0433 # 09 Y:2008 | 09 | 2008 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $7,158 | $4,624 | Not Implemented |
IA0433 # 10 Y:2008 | 10 | 2008 | INSULATE BARE EQUIPMENT | $524 | $254 | Not Implemented |