IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,057

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0119 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $815 $250 Implemented
IA0119 # 05 Y:1995 05 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $510 $25 Implemented
IA0119 # 06 Y:1995 06 1995 USE OPTIMUM THICKNESS INSULATION $303 $1,020 Implemented
IA0119 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $948 $169 Implemented
IA0119 # 08 Y:1995 08 1995 INSTALL OCCUPANCY SENSORS $784 $920 Not Implemented
IA0119 # 09 Y:1995 09 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $909 $1,570 Implemented
IA0119 # 10 Y:1995 10 1995 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $15,944 $2,290 Not Implemented
IA0117 # 01 Y:1995 01 1995 REDUCE VENTILATION AIR $56,609 $143,578 Not Implemented
IA0117 # 02 Y:1995 02 1995 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $15,769 $1,500 Not Implemented
IA0117 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,328 $212 Implemented
IA0117 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,102 $75 Not Implemented
IA0117 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,256 $2,781 Implemented
IA0117 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,532 $3,975 Implemented
IA0116 # 01 Y:1995 01 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,462 $66,000 Implemented
IA0116 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,093 $400 Implemented
IA0116 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $561 $25 Not Implemented
IA0116 # 04 Y:1995 04 1995 INSTALL OCCUPANCY SENSORS $2,771 $3,555 Not Implemented
IA0116 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,384 $520 Not Implemented
IA0116 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,382 $51,892 Implemented
IA0116 # 07 Y:1995 07 1995 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $258 $392 Implemented
IA0116 # 08 Y:1995 08 1995 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $11,090 $7,400 Implemented
IA0116 # 09 Y:1995 09 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,431 $3,614 Not Implemented
IA0116 # 10 Y:1995 10 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $185 $300 Not Implemented
IA0115 # 01 Y:1995 01 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $17,919 $0 Implemented
IA0115 # 02 Y:1995 02 1995 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,223 $8,195 Not Implemented