IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

210

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0232 # 07 Y:1999 07 1999 CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE $9,540 $16,088 Not Implemented
IA0232 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,704 $13,064 Not Implemented
IA0232 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,087 $445 Not Implemented
IA0232 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $704 $828 Not Implemented
IA0232 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,827 $537 Implemented
IA0232 # 05 Y:1999 05 1999 CONVERT TO ELECTROSTATIC POWDER COATING $150,000 $28,000 Not Implemented
IA0232 # 08 Y:1999 08 1999 MOVE PRODUCT USING MECHANICAL MEANS $31,898 $175,500 Not Implemented
IA0232 # 06 Y:1999 06 1999 RECYCLE CLEANING SOLVENT AND REUSE $33,891 $10,300 Implemented
IA0237 # 01 Y:1999 01 1999 RECOVER WASTE HEAT FROM EQUIPMENT $6,880 $1,142 Not Implemented
IA0237 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,914 $8,729 Not Implemented
IA0237 # 07 Y:1999 07 1999 DISTILL CONTAMINATED SOLVENTS FOR REUSE $7,704 $10,300 Not Implemented
IA0237 # 08 Y:1999 08 1999 INSTALL SYSTEM TO COLLECT SCRAP $47,034 $3,932 Not Implemented
IA0237 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,891 $0 Not Implemented
IA0237 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,608 $945 Not Implemented
IA0237 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,447 $264 Not Implemented
IA0237 # 06 Y:1999 06 1999 INSTALL OCCUPANCY SENSORS $247 $466 Not Implemented
IA0227 # 15 Y:1999 15 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $75,440 $146,000 n/a
IA0227 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,254 $2,113 n/a
IA0227 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $66,200 $2,000 n/a
IA0227 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $825,660 $1,863 n/a
IA0227 # 10 Y:1999 10 1999 MAINTAIN MACHINES TO REDUCE LEAKS $2,951 $213 n/a
IA0227 # 09 Y:1999 09 1999 MAINTAIN MACHINES TO REDUCE LEAKS $5,867 $3,906 n/a
IA0227 # 08 Y:1999 08 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $6,074 $3,038 n/a
IA0227 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,875 $0 n/a
IA0227 # 11 Y:1999 11 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $150,880 $166,000 n/a