Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
442
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0297 # 05 Y:2024 | 05 | 2024 | USE OPTIMUM THICKNESS INSULATION | $2,433 | $1,693 | Implemented |
IC0297 # 15 Y:2024 | 15 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,222 | $0 | Implemented |
IC0296 # 12 Y:2024 | 12 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,022 | $1,150 | Implemented |
IC0296 # 09 Y:2024 | 09 | 2024 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $62,421 | $0 | Implemented |
IC0296 # 10 Y:2024 | 10 | 2024 | REPLACE BOILER | $112,681 | $127,793 | Not Implemented |
IC0296 # 07 Y:2024 | 07 | 2024 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $465,211 | $3,649,800 | Not Implemented |
IC0296 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,196 | $12,921 | Not Implemented |
IC0296 # 06 Y:2024 | 06 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,898 | $23,884 | Implemented |
IC0296 # 11 Y:2024 | 11 | 2024 | INSULATE BARE EQUIPMENT | $2,446 | $608 | Implemented |
IC0296 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,777 | $8,406 | Implemented |
IC0296 # 05 Y:2024 | 05 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $7,015 | $9,479 | Not Implemented |
IC0296 # 01 Y:2024 | 01 | 2024 | INSULATE BARE EQUIPMENT | $5,921 | $1,066 | Implemented |
IC0296 # 13 Y:2024 | 13 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $7,154 | $1,011 | Implemented |
IC0296 # 08 Y:2024 | 08 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $271,456 | $1,202,972 | Not Implemented |
IC0296 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,324 | $400 | Implemented |
IC0295 # 06 Y:2024 | 06 | 2024 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $16,247 | $16,893 | Not Implemented |
IC0295 # 03 Y:2024 | 03 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $13,248 | $0 | Implemented |
IC0295 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,221 | $6,343 | Not Implemented |
IC0295 # 07 Y:2024 | 07 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $843 | $490 | Implemented |
IC0295 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,690 | $3,413 | Implemented |
IC0295 # 02 Y:2024 | 02 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,497 | $558 | Implemented |
IC0295 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,828 | $7,539 | Not Implemented |
IC0283 # 01 Y:2023 | 01 | 2023 | INSULATE BARE EQUIPMENT | $112 | $886 | Implemented |
IC0283 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $350 | $840 | Implemented |
IC0283 # 03 Y:2023 | 03 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,791 | $4,650 | Not Implemented |