IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,384

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0101 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $11,368 $15,000 Not Implemented
IC0101 # 06 Y:2005 06 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,574 $21,820 Not Implemented
IC0101 # 07 Y:2005 07 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,313 $231 Not Implemented
IC0101 # 08 Y:2005 08 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,774 $2,688 Not Implemented
IC0101 # 09 Y:2005 09 2005 CHECK FOR ACCURACY OF UTILITY / POWER METERS $2,015 $0 Not Implemented
IC0101 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,235 $11,173 Not Implemented
IC0101 # 11 Y:2005 11 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $893 $1,023 Not Implemented
IC0098 # 01 Y:2005 01 2005 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $64,389 $324,232 Not Implemented
IC0098 # 02 Y:2005 02 2005 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,945 $13,700 Implemented
IC0098 # 03 Y:2005 03 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,381 $0 Implemented
IC0098 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $14,532 $1,400 Not Implemented
IC0098 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,517 $0 Not Implemented
IC0098 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,283 $6,200 Not Implemented
IC0100 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $7,879 $7,081 Not Implemented
IC0100 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,298 $1,400 Not Implemented
IC0100 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,359 $0 Not Implemented
IC0100 # 04 Y:2005 04 2005 USE PHOTOCELL CONTROLS $3,581 $1,428 Not Implemented
IC0100 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,640 $8,722 Not Implemented
IC0100 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $184 $917 Not Implemented
IC0099 # 01 Y:2005 01 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,719 $35,000 Not Implemented
IC0099 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,085 $66,591 Not Implemented
IC0099 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $246 $0 Implemented
IC0099 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,577 $1,200 Implemented
IC0099 # 05 Y:2005 05 2005 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $6,852 $1,520 Implemented
IC0099 # 06 Y:2005 06 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $671 $48 Not Implemented