IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,338

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0031 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,544 $57,230 Not Implemented
IC0031 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $924 $12,002 Not Implemented
IC0031 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,264 $2,894 Implemented
IC0031 # 06 Y:2002 06 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,800 $3,080 Implemented
IC0031 # 07 Y:2002 07 2002 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $9,652 $16,500 Not Implemented
IC0031 # 08 Y:2002 08 2002 RECOVER WASTE HEAT FROM EQUIPMENT $36,439 $18,900 Not Implemented
IC0031 # 09 Y:2002 09 2002 RECOVER WASTE HEAT FROM EQUIPMENT $96,700 $195,000 Not Implemented
IC0031 # 10 Y:2002 10 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $49,201 $45,000 Not Implemented
IC0030 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,316 $1,400 Implemented
IC0030 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,674 $27,188 Implemented
IC0030 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $2,438 $1,225 Not Implemented
IC0030 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,602 $25,370 Implemented
IC0030 # 05 Y:2002 05 2002 $132,950 $36,600 Implemented
IC0030 # 06 Y:2002 06 2002 $9,840 $250 Not Implemented
IC0029 # 01 Y:2002 01 2002 INSULATE BARE EQUIPMENT $1,907 $3,610 Implemented
IC0029 # 02 Y:2002 02 2002 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $9,300 $1,320 Not Implemented
IC0029 # 03 Y:2002 03 2002 REPAIR AND ELIMINATE STEAM LEAKS $10,646 $900 Implemented
IC0029 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,828 $3,000 Implemented
IC0029 # 05 Y:2002 05 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,179 $1,500 Implemented
IC0029 # 06 Y:2002 06 2002 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $36,712 $36,036 Implemented
IC0029 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $1,616 $906 Implemented
IC0029 # 08 Y:2002 08 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $18,000 $3,280 Not Implemented
IC0029 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,753 $49,560 Not Implemented
IC0029 # 10 Y:2002 10 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,519 $20,549 Not Implemented
IC0029 # 11 Y:2002 11 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,182 $4,751 Not Implemented