Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
145
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0233 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,040 | $167 | Not Implemented |
IC0233 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,778 | $2,589 | Not Implemented |
IC0233 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $329 | $167 | Not Implemented |
IC0233 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,788 | $861 | Not Implemented |
IC0189 # 02 Y:2011 | 02 | 2011 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $156,506 | $686,583 | Implemented |
IC0189 # 04 Y:2011 | 04 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,263 | $1,142 | Implemented |
IC0189 # 07 Y:2011 | 07 | 2011 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $294 | $0 | Not Implemented |
IC0189 # 03 Y:2011 | 03 | 2011 | UPGRADE OBSOLETE EQUIPMENT | $12,266 | $100,000 | Implemented |
IC0189 # 06 Y:2011 | 06 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $43 | $58 | Implemented |
IC0189 # 01 Y:2011 | 01 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,166 | $0 | Implemented |
IC0189 # 05 Y:2011 | 05 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,441 | $382 | Implemented |
IC0185 # 03 Y:2011 | 03 | 2011 | INSTALL OCCUPANCY SENSORS | $604 | $1,719 | n/a |
IC0185 # 01 Y:2011 | 01 | 2011 | REPAIR AND ELIMINATE STEAM LEAKS | $1,075 | $200 | Not Implemented |
IC0185 # 04 Y:2011 | 04 | 2011 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $283 | $1 | n/a |
IC0185 # 06 Y:2011 | 06 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $205 | $334 | n/a |
IC0185 # 05 Y:2011 | 05 | 2011 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,057 | $115 | n/a |
IC0185 # 07 Y:2011 | 07 | 2011 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $260,354 | $102,100 | n/a |
IC0185 # 02 Y:2011 | 02 | 2011 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $66,621 | $315,096 | n/a |
IC0182 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,045 | $43,859 | Not Implemented |
IC0182 # 09 Y:2011 | 09 | 2011 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $2,442 | $311 | Not Implemented |
IC0182 # 08 Y:2011 | 08 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $950 | $311 | Not Implemented |
IC0182 # 14 Y:2011 | 14 | 2011 | OPTIMIZE PLANT POWER FACTOR | $3,378 | $20,932 | Not Implemented |
IC0182 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $273 | $0 | Not Implemented |
IC0182 # 15 Y:2011 | 15 | 2011 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $110 | $0 | Not Implemented |
IC0182 # 06 Y:2011 | 06 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,070 | $0 | Not Implemented |