IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

145

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0233 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,040 $167 Not Implemented
IC0233 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,778 $2,589 Not Implemented
IC0233 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $329 $167 Not Implemented
IC0233 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,788 $861 Not Implemented
IC0189 # 02 Y:2011 02 2011 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $156,506 $686,583 Implemented
IC0189 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,263 $1,142 Implemented
IC0189 # 07 Y:2011 07 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $294 $0 Not Implemented
IC0189 # 03 Y:2011 03 2011 UPGRADE OBSOLETE EQUIPMENT $12,266 $100,000 Implemented
IC0189 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43 $58 Implemented
IC0189 # 01 Y:2011 01 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,166 $0 Implemented
IC0189 # 05 Y:2011 05 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $4,441 $382 Implemented
IC0185 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $604 $1,719 n/a
IC0185 # 01 Y:2011 01 2011 REPAIR AND ELIMINATE STEAM LEAKS $1,075 $200 Not Implemented
IC0185 # 04 Y:2011 04 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $283 $1 n/a
IC0185 # 06 Y:2011 06 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $205 $334 n/a
IC0185 # 05 Y:2011 05 2011 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,057 $115 n/a
IC0185 # 07 Y:2011 07 2011 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $260,354 $102,100 n/a
IC0185 # 02 Y:2011 02 2011 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $66,621 $315,096 n/a
IC0182 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,045 $43,859 Not Implemented
IC0182 # 09 Y:2011 09 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,442 $311 Not Implemented
IC0182 # 08 Y:2011 08 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $950 $311 Not Implemented
IC0182 # 14 Y:2011 14 2011 OPTIMIZE PLANT POWER FACTOR $3,378 $20,932 Not Implemented
IC0182 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $273 $0 Not Implemented
IC0182 # 15 Y:2011 15 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $110 $0 Not Implemented
IC0182 # 06 Y:2011 06 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,070 $0 Not Implemented