Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,344
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0158 # 09 Y:1985 | 09 | 1985 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,667 | $2,000 | Implemented |
KU0158 # 10 Y:1985 | 10 | 1985 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,572 | $500 | Implemented |
KU0158 # 12 Y:1985 | 12 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,160 | $0 | Implemented |
KU0158 # 13 Y:1985 | 13 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $903 | $1,600 | Implemented |
KU0159 # 01 Y:1985 | 01 | 1985 | INSULATE BARE EQUIPMENT | $1,719 | $500 | Implemented |
KU0159 # 02 Y:1985 | 02 | 1985 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,530 | $20,000 | Implemented |
KU0159 # 03 Y:1985 | 03 | 1985 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $799 | $1,500 | Implemented |
KU0159 # 04 Y:1985 | 04 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,842 | $2,505 | Implemented |
KU0159 # 06 Y:1985 | 06 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $115 | $0 | Implemented |
KU0160 # 01 Y:1985 | 01 | 1985 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,445 | $10,000 | Implemented |
KU0160 # 02 Y:1985 | 02 | 1985 | INSULATE BARE EQUIPMENT | $1,982 | $900 | Implemented |
KU0160 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,662 | $2,000 | Implemented |
KU0161 # 01 Y:1985 | 01 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,195 | $3,957 | Implemented |
KU0161 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $182 | $0 | Implemented |
KU0161 # 03 Y:1985 | 03 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $49 | $40 | Implemented |
KU0157 # 02 Y:1985 | 02 | 1985 | IMPROVE LUBRICATION PRACTICES | $1,569 | $290 | Implemented |
KU0157 # 03 Y:1985 | 03 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,260 | $4,000 | Implemented |
KU0157 # 04 Y:1985 | 04 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,889 | $1,550 | Implemented |
KU0157 # 05 Y:1985 | 05 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $759 | $1,016 | Implemented |
KU0157 # 06 Y:1985 | 06 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,893 | $1,500 | Implemented |
KU0157 # 07 Y:1985 | 07 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $899 | $1,480 | Implemented |
KU0157 # 08 Y:1985 | 08 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $357 | $0 | Implemented |
KU0157 # 09 Y:1985 | 09 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $745 | $1,100 | Implemented |
KU0152 # 01 Y:1985 | 01 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,790 | $1,100 | Implemented |
KU0152 # 03 Y:1985 | 03 | 1985 | USE OPTIMUM TEMPERATURE | $2,973 | $2,000 | Implemented |