IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,537

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0513 # 01 Y:1999 01 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $166,610 $85,440 Implemented
KU0513 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,800 $700 Implemented
KU0513 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $3,080 $4,830 Implemented
KU0513 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,450 $1,810 Not Implemented
KU0513 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $950 $1,000 Implemented
KU0513 # 06 Y:1999 06 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $1,250 $1,000 Implemented
KU0513 # 07 Y:1999 07 1999 $23,400 $61,400 Implemented
KU0513 # 08 Y:1999 08 1999 $7,210 $2,360 Not Implemented
KU0512 # 01 Y:1999 01 1999 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC $30,880 $31,230 Not Implemented
KU0512 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,150 $28,520 Not Implemented
KU0512 # 03 Y:1999 03 1999 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $10,840 $18,000 Not Implemented
KU0512 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $2,640 $810 Not Implemented
KU0512 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,460 $270 Not Implemented
KU0512 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,120 $1,800 Not Implemented
KU0512 # 07 Y:1999 07 1999 INSULATE BARE EQUIPMENT $1,520 $1,030 Not Implemented
KU0512 # 08 Y:1999 08 1999 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $990 $700 Not Implemented
KU0512 # 09 Y:1999 09 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $550 $770 Not Implemented
KU0512 # 10 Y:1999 10 1999 CONVERT TO ELECTROSTATIC POWDER COATING $278,220 $513,480 Not Implemented
KU0512 # 11 Y:1999 11 1999 $800,000 $29,240 Not Implemented
KU0512 # 12 Y:1999 12 1999 $220,990 $233,750 Not Implemented
KU0511 # 01 Y:1998 01 1998 RECOVER WASTE HEAT FROM EQUIPMENT $25,680 $19,610 Implemented
KU0511 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,600 $32,720 Not Implemented
KU0511 # 03 Y:1998 03 1998 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,080 $3,040 Implemented
KU0511 # 04 Y:1998 04 1998 RECOVER WASTE HEAT FROM EQUIPMENT $2,570 $2,550 Implemented
KU0511 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,560 $800 Implemented