IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

395

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0298 # 11 Y:1989 11 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $120 $0 Implemented
KU0283 # 01 Y:1989 01 1989 RECOVER WASTE HEAT FROM EQUIPMENT $935 $462 Not Implemented
KU0283 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,133 $1,133 Not Implemented
KU0283 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $187 $0 Implemented
KU0283 # 04 Y:1989 04 1989 IMPROVE LUBRICATION PRACTICES $167 $0 Implemented
KU0283 # 05 Y:1989 05 1989 TURN OFF EQUIPMENT WHEN NOT IN USE $291 $350 Implemented
KU0283 # 06 Y:1989 06 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,986 $4,440 Not Implemented
KU0283 # 07 Y:1989 07 1989 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $318 $0 Not Implemented
KU0283 # 08 Y:1989 08 1989 REDESIGN PROCESS $11,461 $13,200 Not Implemented
KU0283 # 09 Y:1989 09 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $241 $0 Implemented
KU0283 # 10 Y:1989 10 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,395 $2,300 Not Implemented
KU0284 # 01 Y:1989 01 1989 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $831,745 $1,230,000 Implemented
KU0284 # 02 Y:1989 02 1989 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $139,391 $226,000 Implemented
KU0284 # 03 Y:1989 03 1989 INSTALL SET-BACK TIMERS $16,143 $5,856 Implemented
KU0284 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,092 $3,080 Implemented
KU0284 # 05 Y:1989 05 1989 IMPROVE LUBRICATION PRACTICES $2,169 $0 Implemented
KU0284 # 06 Y:1989 06 1989 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $618 $0 Implemented
KU0284 # 07 Y:1989 07 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $931 $1,018 Implemented
KU0284 # 08 Y:1989 08 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $169 $0 Implemented
KU0263 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,737 $5,000 Implemented
KU0263 # 02 Y:1988 02 1988 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,188 $4,000 Not Implemented
KU0263 # 03 Y:1988 03 1988 RECOVER WASTE HEAT FROM EQUIPMENT $1,211 $1,600 Implemented
KU0263 # 04 Y:1988 04 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,486 $1,308 Implemented
KU0263 # 05 Y:1988 05 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $219 $0 Implemented
KU0263 # 06 Y:1988 06 1988 SHUT OFF PILOTS IN STANDBY EQUIPMENT $187 $0 Implemented