IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,537

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0550 # 01 Y:2000 01 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $8,989 $17,000 Not Implemented
KU0549 # 02 Y:2000 02 2000 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) $2,132 $3,172 Implemented
KU0549 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $2,352 $150 Not Implemented
KU0548 # 02 Y:2000 02 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,154 $11,500 n/a
KU0548 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,604 $40 n/a
KU0548 # 01 Y:2000 01 2000 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $13,917 $0 n/a
KU0548 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,422 $1,050 n/a
KU0548 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $3,963 $1,505 n/a
KU0548 # 06 Y:2000 06 2000 MINIMIZE WATER USAGE $4,075 $4,075 n/a
KU0547 # 07 Y:2000 07 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,400 $0 Not Implemented
KU0547 # 08 Y:2000 08 2000 $270 $540 Not Implemented
KU0547 # 04 Y:2000 04 2000 DISCONNECT BALLASTS $310 $120 Not Implemented
KU0547 # 06 Y:2000 06 2000 MINIMIZE WATER USAGE $340 $800 Not Implemented
KU0547 # 02 Y:2000 02 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $630 $0 Implemented
KU0547 # 01 Y:2000 01 2000 USE RADIANT HEATER FOR SPOT HEATING $1,640 $6,670 Not Implemented
KU0547 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $310 $30 Not Implemented
KU0547 # 03 Y:2000 03 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $680 $200 Implemented
KU0546 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $870 $740 Implemented
KU0546 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $17,000 $9,570 Not Implemented
KU0546 # 02 Y:2000 02 2000 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $74,779 $244,140 Not Implemented
KU0546 # 04 Y:2000 04 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,500 $1,000 Implemented
KU0546 # 01 Y:2000 01 2000 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $431,791 $2,400,000 Not Implemented
KU0545 # 06 Y:2000 06 2000 COMBINE UTILITY METERS $1,450 $4,000 Implemented
KU0545 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,890 $20 Implemented
KU0545 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $12,740 $4,370 Implemented