IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,813

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0361 # 07 Y:1992 07 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $474 $350 Implemented
KU0361 # 08 Y:1992 08 1992 RECOVER WASTE HEAT FROM EQUIPMENT $832 $500 Implemented
KU0351 # 01 Y:1991 01 1991 INSTALL TIMERS AND/OR THERMOSTATS $5,020 $3,380 Implemented
KU0351 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,664 $744 Implemented
KU0351 # 03 Y:1991 03 1991 INSTALL SET-BACK TIMERS $693 $400 Implemented
KU0351 # 04 Y:1991 04 1991 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,047 $1,600 Implemented
KU0351 # 05 Y:1991 05 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $662 $0 Implemented
KU0349 # 01 Y:1991 01 1991 ISOLATE HOT OR COLD EQUIPMENT $4,092 $5,200 Not Implemented
KU0349 # 02 Y:1991 02 1991 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,460 $2,800 Not Implemented
KU0349 # 03 Y:1991 03 1991 INSTALL SET-BACK TIMERS $1,110 $200 Not Implemented
KU0349 # 04 Y:1991 04 1991 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $934 $1,500 Not Implemented
KU0349 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $677 $850 Not Implemented
KU0349 # 06 Y:1991 06 1991 USE MINIMUM SAFE OVEN VENTILATION $1,377 $0 Not Implemented
KU0349 # 07 Y:1991 07 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $413 $0 Not Implemented
KU0349 # 08 Y:1991 08 1991 OPTIMIZE PLANT POWER FACTOR $1,702 $3,024 Not Implemented
KU0349 # 09 Y:1991 09 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $829 $410 Not Implemented
KU0349 # 10 Y:1991 10 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $222 $380 Not Implemented
KU0349 # 11 Y:1991 11 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $128 $0 Not Implemented
KU0350 # 01 Y:1991 01 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $36,079 $0 Implemented
KU0350 # 02 Y:1991 02 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,101 $12,000 Implemented
KU0350 # 03 Y:1991 03 1991 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $6,192 $7,440 Implemented
KU0350 # 04 Y:1991 04 1991 INSTALL SET-BACK TIMERS $995 $550 Implemented
KU0350 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $550 $950 Implemented
KU0350 # 06 Y:1991 06 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,198 $1,230 Implemented
KU0350 # 07 Y:1991 07 1991 RECOVER WASTE HEAT FROM EQUIPMENT $692 $450 Implemented