Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
112
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0259 # 07 Y:1988 | 07 | 1988 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $285 | $0 | Implemented |
KU0259 # 08 Y:1988 | 08 | 1988 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $225 | $150 | Implemented |
KU0259 # 09 Y:1988 | 09 | 1988 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $149 | $160 | Not Implemented |
KU0259 # 10 Y:1988 | 10 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $105 | $0 | Implemented |
KU0235 # 01 Y:1987 | 01 | 1987 | IMPROVE LUBRICATION PRACTICES | $11,769 | $0 | Not Implemented |
KU0235 # 02 Y:1987 | 02 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,844 | $0 | Implemented |
KU0235 # 03 Y:1987 | 03 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,582 | $400 | Implemented |
KU0235 # 04 Y:1987 | 04 | 1987 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,242 | $4,000 | Implemented |
KU0235 # 05 Y:1987 | 05 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,629 | $0 | Not Implemented |
KU0235 # 06 Y:1987 | 06 | 1987 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $935 | $1,800 | Not Implemented |
KU0235 # 07 Y:1987 | 07 | 1987 | INSTALL AUTOMATIC STACK DAMPER | $784 | $1,275 | Not Implemented |
KU0235 # 08 Y:1987 | 08 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $524 | $0 | Not Implemented |
KU0235 # 09 Y:1987 | 09 | 1987 | INSULATE BARE EQUIPMENT | $643 | $150 | Not Implemented |
KU0235 # 10 Y:1987 | 10 | 1987 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $162 | $0 | Implemented |
KU0235 # 11 Y:1987 | 11 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $131 | $50 | Not Implemented |
KU0236 # 01 Y:1987 | 01 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,730 | $8,946 | Implemented |
KU0236 # 02 Y:1987 | 02 | 1987 | INSTALL AUTOMATIC STACK DAMPER | $1,183 | $1,700 | Not Implemented |
KU0236 # 03 Y:1987 | 03 | 1987 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,055 | $0 | Implemented |
KU0236 # 04 Y:1987 | 04 | 1987 | IMPROVE LUBRICATION PRACTICES | $905 | $0 | Not Implemented |
KU0236 # 05 Y:1987 | 05 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $725 | $0 | Implemented |
KU0236 # 06 Y:1987 | 06 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $388 | $0 | Not Implemented |
KU0236 # 07 Y:1987 | 07 | 1987 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $691 | $1,000 | Not Implemented |
KU0236 # 08 Y:1987 | 08 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $582 | $120 | Implemented |
KU0236 # 09 Y:1987 | 09 | 1987 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $194 | $40 | Not Implemented |
KU0236 # 10 Y:1987 | 10 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $172 | $120 | Implemented |