Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

112

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0319 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $468 $360 Implemented
KU0319 # 02 Y:1990 02 1990 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $6,698 $1,200 Implemented
KU0319 # 06 Y:1990 06 1990 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $832 $487 Implemented
KU0315 # 01 Y:1990 01 1990 RECOVER AND REUSE COOLING WATER $4,123 $7,000 Implemented
KU0315 # 05 Y:1990 05 1990 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,282 $100 Implemented
KU0316 # 07 Y:1990 07 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $117 $0 Not Implemented
KU0316 # 04 Y:1990 04 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,990 $7,200 Not Implemented
KU0316 # 06 Y:1990 06 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,034 $1,000 Implemented
KU0319 # 07 Y:1990 07 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,125 $0 Implemented
KU0316 # 03 Y:1990 03 1990 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,122 $15,000 Implemented
KU0319 # 03 Y:1990 03 1990 INSTALL TIMERS AND/OR THERMOSTATS $604 $400 Implemented
KU0316 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $924 $1,005 Implemented
KU0319 # 01 Y:1990 01 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,684 $2,597 Not Implemented
KU0316 # 05 Y:1990 05 1990 OPTIMIZE PLANT POWER FACTOR $2,160 $2,250 Implemented
KU0319 # 04 Y:1990 04 1990 AIR CONDITION ONLY SPACE NECESSARY $168 $400 Implemented
KU0315 # 03 Y:1990 03 1990 INSTALL SET-BACK TIMERS $1,130 $640 Implemented
KU0315 # 04 Y:1990 04 1990 OPTIMIZE PLANT POWER FACTOR $518 $900 Not Implemented
KU0316 # 01 Y:1990 01 1990 INSTALL SET-BACK TIMERS $3,487 $2,075 Implemented
KU0315 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $862 $100 Implemented
KU0297 # 02 Y:1989 02 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,367 $0 Not Implemented
KU0297 # 08 Y:1989 08 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $581 $350 Implemented
KU0297 # 07 Y:1989 07 1989 RECOVER WASTE HEAT FROM EQUIPMENT $2,339 $7,000 Not Implemented
KU0297 # 03 Y:1989 03 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,843 $3,200 Not Implemented
KU0297 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $218 $119 Implemented
KU0297 # 05 Y:1989 05 1989 OPTIMIZE PLANT POWER FACTOR $7,688 $13,500 Implemented