IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,361

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0045 # 04 Y:1982 04 1982 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,638 $0 Implemented
KU0045 # 05 Y:1982 05 1982 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $659 $200 Implemented
KU0045 # 07 Y:1982 07 1982 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $547 $0 Implemented
KU0045 # 08 Y:1982 08 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $417 $0 Implemented
KU0035 # 04 Y:1982 04 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,265 $535 Implemented
KU0035 # 05 Y:1982 05 1982 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $8,165 $22,000 Implemented
KU0033 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,443 $3,935 Implemented
KU0033 # 02 Y:1982 02 1982 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,573 $0 Implemented
KU0033 # 03 Y:1982 03 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $509 $700 Implemented
KU0033 # 04 Y:1982 04 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $69 $0 Implemented
KU0025 # 01 Y:1981 01 1981 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $169 $100 Implemented
KU0025 # 05 Y:1981 05 1981 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,689 $3,748 Implemented
KU0029 # 01 Y:1981 01 1981 COVER OPEN TANKS $2,125 $55 Implemented
KU0029 # 02 Y:1981 02 1981 INSTALL TIMERS AND/OR THERMOSTATS $310 $0 Implemented
KU0029 # 04 Y:1981 04 1981 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,911 $0 Implemented
KU0029 # 05 Y:1981 05 1981 OPTIMIZE PLANT POWER FACTOR $310 $500 Implemented
KU0029 # 06 Y:1981 06 1981 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,568 $2,688 Implemented
KU0029 # 07 Y:1981 07 1981 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,505 $6,302 Implemented
KU0022 # 02 Y:1981 02 1981 INSTALL TIMERS AND/OR THERMOSTATS $2,320 $1,500 Implemented
KU0022 # 05 Y:1981 05 1981 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $940 $1,950 Implemented
KU0022 # 06 Y:1981 06 1981 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $620 $1,620 Implemented
KU0016 # 02 Y:1981 02 1981 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $748 $928 Implemented
KU0016 # 03 Y:1981 03 1981 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $15,275 $39,000 Implemented
KU0017 # 01 Y:1981 01 1981 RECOVER WASTE HEAT FROM EQUIPMENT $2,038 $4,000 Implemented
KU0017 # 02 Y:1981 02 1981 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,749 $0 Implemented