Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
225
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0299 # 04 Y:1989 | 04 | 1989 | REPAIR OR REPLACE STEAM TRAPS | $8,388 | $450 | Implemented |
KU0298 # 01 Y:1989 | 01 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,437 | $382 | Implemented |
KU0297 # 04 Y:1989 | 04 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $339 | $1,200 | Implemented |
KU0300 # 05 Y:1989 | 05 | 1989 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,393 | $2,000 | Implemented |
KU0297 # 08 Y:1989 | 08 | 1989 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $581 | $350 | Implemented |
KU0297 # 02 Y:1989 | 02 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,367 | $0 | Not Implemented |
KU0298 # 05 Y:1989 | 05 | 1989 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $1,951 | $3,700 | Not Implemented |
KU0298 # 04 Y:1989 | 04 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $261 | $300 | Implemented |
KU0297 # 01 Y:1989 | 01 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $218 | $119 | Implemented |
KU0298 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $380 | $76 | Implemented |
KU0299 # 06 Y:1989 | 06 | 1989 | INSTALL AUTOMATIC STACK DAMPER | $1,466 | $1,700 | Not Implemented |
KU0298 # 10 Y:1989 | 10 | 1989 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $361 | $0 | Implemented |
KU0297 # 05 Y:1989 | 05 | 1989 | OPTIMIZE PLANT POWER FACTOR | $7,688 | $13,500 | Implemented |
KU0298 # 07 Y:1989 | 07 | 1989 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $856 | $700 | Not Implemented |
KU0298 # 11 Y:1989 | 11 | 1989 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $120 | $0 | Implemented |
KU0298 # 03 Y:1989 | 03 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,572 | $100 | Implemented |
KU0298 # 09 Y:1989 | 09 | 1989 | INSTALL AUTOMATIC STACK DAMPER | $531 | $1,020 | Not Implemented |
KU0297 # 06 Y:1989 | 06 | 1989 | TREAT AND REUSE RINSE WATERS | $15,540 | $9,000 | Implemented |
KU0297 # 07 Y:1989 | 07 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,339 | $7,000 | Not Implemented |
KU0299 # 05 Y:1989 | 05 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,205 | $2,400 | Not Implemented |
KU0298 # 06 Y:1989 | 06 | 1989 | ISOLATE HOT OR COLD EQUIPMENT | $1,026 | $1,800 | Not Implemented |
KU0297 # 03 Y:1989 | 03 | 1989 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,843 | $3,200 | Not Implemented |
KU0299 # 02 Y:1989 | 02 | 1989 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $447 | $250 | Implemented |
KU0299 # 03 Y:1989 | 03 | 1989 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $315 | $150 | Not Implemented |
KU0299 # 01 Y:1989 | 01 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $421 | $121 | Implemented |