Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
241
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0511 # 04 Y:1998 | 04 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,570 | $2,550 | Implemented |
KU0511 # 13 Y:1998 | 13 | 1998 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $4,980 | $10,000 | Implemented |
KU0511 # 09 Y:1998 | 09 | 1998 | MODIFY STARTUP/SHUTDOWN TIMES | $75,530 | $0 | Not Implemented |
KU0511 # 11 Y:1998 | 11 | 1998 | AUTOMATE FINISHING PROCESS | $12,150 | $42,810 | Not Implemented |
KU0511 # 05 Y:1998 | 05 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,560 | $800 | Implemented |
KU0511 # 12 Y:1998 | 12 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $5,560 | $690 | Implemented |
KU0511 # 14 Y:1998 | 14 | 1998 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $4,120 | $4,400 | Not Implemented |
KU0511 # 08 Y:1998 | 08 | 1998 | INSULATE BARE EQUIPMENT | $230 | $680 | Implemented |
KU0511 # 10 Y:1998 | 10 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $15,070 | $17,000 | Implemented |
KU0511 # 07 Y:1998 | 07 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $590 | $360 | Implemented |
KU0511 # 15 Y:1998 | 15 | 1998 | PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW | $1,300 | $800 | Not Implemented |
KU0511 # 02 Y:1998 | 02 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,600 | $32,720 | Not Implemented |
KU0511 # 06 Y:1998 | 06 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,670 | $3,960 | Implemented |
KU0511 # 03 Y:1998 | 03 | 1998 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $3,080 | $3,040 | Implemented |
KU0511 # 01 Y:1998 | 01 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $25,680 | $19,610 | Implemented |
KU0510 # 04 Y:1998 | 04 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $350 | $1,000 | Implemented |
KU0510 # 06 Y:1998 | 06 | 1998 | CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS | $14,350 | $8,630 | Not Implemented |
KU0510 # 05 Y:1998 | 05 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $310 | $400 | Implemented |
KU0510 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,400 | $4,710 | Implemented |
KU0510 # 07 Y:1998 | 07 | 1998 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $3,900 | $11,720 | Not Implemented |
KU0510 # 01 Y:1998 | 01 | 1998 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $6,740 | $200 | Implemented |
KU0510 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,670 | $900 | Implemented |
KU0510 # 08 Y:1998 | 08 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $1,350 | $2,310 | Implemented |
KU0509 # 08 Y:1998 | 08 | 1998 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $10,600 | $13,800 | Not Implemented |
KU0509 # 07 Y:1998 | 07 | 1998 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $2,330 | $4,200 | Not Implemented |